Jump to content

nharrod

Member
  • Posts

    215
  • Joined

  • Last visited

Posts posted by nharrod

  1. Antique Bureau Bow Fronted Desk.


    Solid wood, maybe mahogany, in excellent condition. Not sure if repro or genuine antique.


    Leather covered writing surface


    Dimensions: 81cm h x 72cm w x 40cm d


    Draws with solid bottoms and brass fixtures and hinges


    Heavy and solid, not a cheap repro


    ?300 ono


    Collection from London SE23 or can arrange a courier yourself or through me at additional cost

  2. I have no idea how they do traditional builds, I would suggest going to someone else for that probably so you know who you are dealing with.


    For us the whole process took about about 6-7 months from first interest to completion. That included waiting for awaiting other quotes, design process, planning permission, awaiting for party wall surveys, price negotiations, build, dropping ceilings, crane lift, make good and snagging. Over all its a lot less painful than a traditional one especially if you are living at the property and have kids. For example we had no roof for just one night as opposed to weeks on a traditional build.

  3. Yes we had it built up in Doncaster and it was craned in at end of Jan. If you don't need your ceilings dropped the whole onsite build process should last about 2-3 weeks. The planning, design, surveying and part wall side of things obviously takes a reasonable amount of time. They will employ a local partner to do the prep works and install once delivered and craned in, they have in the main been good but the more modular builds they do the better and faster they are getting. You can see pics and videos of the build on my instagram if you wish to see them @neil.harrod


    Neil

Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...