Jump to content

Wanted: 2 bedroom flat from end of September


jamesgs

Recommended Posts

One bedroom flat within easy walking distance of Crofton Park and Ladywell Stations. The property is offered unfurnished or part furnished and available from beginning of September. Please contact me on 07828525340 if you would like to view the pictures, as i cannot upload them. The property comprises a full fitted intergrated kitchen, reception room, eat-in kitchen and large double bedroom. The property also has a private rear garden and a front patio garden.


I would consider a short let of minimum 4 months


The flat can also be used as a 2 bedroom as the living room has been previously used as a bedroom. If its used as a 2 bed there wouldnt be a lounge. So this would suit 2 shares. The maximum number of tenants would be two.

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • I wonder if DE lobbied for the pedestrian crossings at the junction if they have plans to develop the site for housing. 
    • Big black Irish wolfhound wandering around Peckham rye on the grassy area near the smaller playground (not the cafe one). Couldn’t see an obvious owner, he had a collar on and very placid but no details on collar. He wandered off (and I wasn’t in a position to stay) but please can folks keep an eye out if he’s still wandering about later in case he has been abandoned. Park ranger numbers were not working 😞 
    • I read somewhere that it was to be an Orleans Smokehouse, opening in December, which seems unlikely
    • There are "plans" to build more reservoirs, with physical work yet to be started, with the first hoped to be completed by 2036, and a second by 2040, then time is needed for them to fill so add at least another 12 months on. However, if the 1.5 million homes are built by 2028, each averaging 2 people occupying them.(some will be more, some will be less) then thats 3 million people showering, bathing and using water.  Therefore there is a massive demand that will strain our current inferstructure between 2028 and 2037 (nearly ten years) plus all those homes will need electricity, as the ambition is to phase gas usage out, which will take just as much time to reinforce the network to cover, let alone add in the ability to cope with green production electricity that needs to be moved from wind and solar farms to where it is most needed.  Therefore, is the current plan to build more homes, regardless of where they are,  potentially going to have serious ramifications on already creaking networks ? 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...