nbb Posted September 7, 2017 Share Posted September 7, 2017 HiWe have pulled down an old dodgy lean-to and now the tile floor remains and needs to be lifted. I'd like to get some help with that, plus perhaps some digging afterwards to prepare for sunken deck to be built. I'm starting with the lifting of the floor first and will see what it reveals. I'm looking for someone to help me from Monday if possible.PM me please. Link to comment https://www.eastdulwichforum.co.uk/topic/166217-looking-for-help-with-lifting-a-tile-floor-and-possibly-digging-afterwards/ Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.