4 Years ago we had the kitchen extended and due to substandard ground work (suspended floor, poor tiling, incorrect materials used), we have had to have our kitchen floor completely taken out and done a fresh.


We have a kitchen of around 40sqm2 surface space.


The new floor consists of concrete, insulation blocks, wet underfloor pipes, screed and our new rectified porceline tiles (tiles alone cost us ?1500).


The company we appointed for the renovaton of our kitchen along with the kitchen floor this time around were aware of our previous issues and therefore gave us a lot of reassurances/gurantees and proimised they would get this right for us.


When the screed finally went down, ready for the tiling, it was obvious the floor was not level.

The contract we had mentioned we should of had a decoupling membrane put down prior to tiling.


When the tiler started the job, no membrane was put down initally and the builders on the previous day forgot to trun off the underfloor heating, so the floor was very hot when he laid 15 tiles down (these tiles were lifted and relaid the next day).

That evening we inspected the work and sraight away identified -

1. The floor was uneven

2. The tiles were unevenly laid (lips and grout lines)

3. The tiles had hollow sounds in them ( as he was not back buttering them)

4. The height of the floor was higher then our passage and therefore they needed to use a threshhold big enough and at an angle to get away with the small step into the kitchen (I specifically asked for no steps into our ktichen).


The tiler/PM was notified about the issues and while they put a membrane down and some SLC, the completed tiled floor still has the same issues.

Most of the floor runs at a 3mm-4mm gradiant...

There are also many chips on the tiles (16 tiles) as when he kicked off the leveling clips, they created small chips in the tiles...


Due to these issues, initally the PM wanted to part ways without acknowldging the issues and he thought we was simply making a meal of things.

Since he has now visited the site, he has seen the issues and has sent us an email to compensate us ?800 plus removing/replacing the tiles that have noticeable uneven lippage and grout lines (Is this posisble without damaging other tiles and the membrane?).

Do you all think this a good form of compensation?


We would request the whole floor gets redone but unfortunately our new kitchen is due to be fitted in by the kitchen company next week and we cannot have any more delays...

I don't have any suggestions re compensation, but I just wanted to say how much I feel for you.


I have had so much substandard work done by "builders" etc in my house, and it is absolutely soul-destroying when it is your home and you know exactly how things should be, not to mention the stress and financial cost involved.

Politely but firmly request your full compensation.


If this doesn't work then say that you will take action through the small claims court.


Then it gets more painful as even if you get judgement enforcing can be a pain in the neck. You can sell the debt to an enforcement company, walk away and let them do the hard man stuff.


Speak to trading standards who may help.

Politely but firmly request your full compensation.


If this doesn't work then say that you will take action through the small claims court.


Then it gets more painful as even if you get judgement enforcing can be a pain in the neck. You can sell the debt to an enforcement company, walk away and let them do the hard man stuff.


Speak to trading standards who may help.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • That explains why no-one was there when I went yesterday. Something else to complain about this evening then, and given that at least one adjacent ward is having their Labour Party branch AGM this evening (the one Renata Hamvas belongs to), may well be raised in passing conversation there😉 . 
    • Why do the street  tree people turn up on the day they are going to actually do  work on a tree, say they need to park their large  vehicle in three adjacent free car spaces, and then expect to be able to immediately find the owners of every nearby car??? And then if they do by luck manage to find one, expect them to move their car somewhere else even though every other space  in the road is taken? And even if that would  leave only one car space, which they can't actually use anyway because they can't find the owners of the other two cars parked next to it? Is it beyond the wit of the tree department to put a communication through the door of nearby houses a week (say)  in advance asking them to save three  spaces on the day?  And even providing cones to do so? I hate to think how much time must be wasted on this. And now, the tree people have come back on another day and seem to be managing to do the work anyway even though there are still no parking spaces near the tree 🙄 
    • Looks as if you are right https://jobs.honestburgers.co.uk/locations/dulwich  
    • GBK has gone next to Farmers, showing as permanently closed on Google maps. Could be one of the sites being replaced by an Honest Burgers?
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...