Jump to content

Recommended Posts

Hi Zak,

Trams have lower running costs than trolley buses, attract more people out of their cars and are only marginally more expensive to construct.


Hi undisputed truth,

Lewisham Council have done more of the running over any possible Bakerloo Line extension than Southwark Council. I ensured routing it via Camberwell was in Southwark's master plan but if Southwark really wanted it it would need to do more. What kicked of Woolwich Arsenal extension was a ?60,000 study and a lot of hard work by Greenwich Council. Sadly I don't see any such level of effort by Southwark Council.

Equally TfL are talking about Chelsea-Hackney route for a new tube and not talking about Bakerloo Line extension.

IF a Bakerloo Line extension was started in 2020 the way TfL would build it would meant 2025 opening at the earliest. The proposed tram could be built within 12 months of planning approval.

Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-563705
Share on other sites

James,


Whilst it's true that Lewisham Council have done more of the running for the Bakerloo extension than Southwark, let's not forget previous work produced in the Kent RUS and TfL's preliminary study. I too am dismayed by Southwark's lack of effort over the Bakerloo extension.


The Chelsea-Hackney route is in fact Crossrail 2 and would allow Wimbledon rail users journeys to St Pancras and beyond. Useful knowledge in view of the current consultation on the combined Thameslink, Southern and Great Northern franchise.


I do have some concerns about the long term viability and strategic direction of your tram scheme despite being pro tram.

Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-563783
Share on other sites

  • 1 month later...

The proposers have obtained the main planning permissions they need for their Preston Scheme.

Why is this important. Many argue against a tram in Southwark as they've yet to build a tram. So in my mind Southwakr is more likely ot happen once they've started digging up roads in Preston.


The proposers are also walking/surveying the route in detail starting Sunday 23rd.

Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-576962
Share on other sites

Sorry I'm all for more public transport but This doesn't half look like the Monorail Scheme in Springfield. I believe there was a fire in Preston too when this company tried to build a system. Also the East West journeys are the worst catered for Southwark not North South.
Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-576990
Share on other sites

Hi the-e-dealer,

The fire according to the insurance investigation owas arson on the test prototype tram.


East-west routes across Southwark. Hmmm. Brois has made it clear he will not finance new trams - or tube routes. The East-west routes are Boris controlled roads. So if a tram is proposed along such routes - and they have just as many bus and train routes as the route proposed south-north it would stand much less chance of gaining TfL support. Also the heart of Southwakr regeneration is the Elephant & Castle which the proposers route goes via.


but if you know another private enterprise willing to build such a route as you appear to be proposing please do encourage them.

Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-577071
Share on other sites

James Barber Wrote:

-------------------------------------------------------

> Hi the-e-dealer,

> The fire according to the insurance investigation

> owas arson on the test prototype tram.


How can it be Arson When



18 The RAIB examination of the tram indicated that the seat of the fire was in an under-floor compartment below the first, rearward facing, passenger seat behind and to the righthand side of the B end driving position. This compartment is constructed of plywood and houses both 24 and 650 volt electrical equipment including rheostatic brake resistors. The air to cool this compartment is drawn from a central channel that houses the traction motor.


19 There was no evidence of a defect or failure within the 650 volt power control system. The 24 volt wiring in the underfloor compartment was severely damaged and a conclusive analysis was not possible. It is probable that the fire began within the 24 volt electrical system. This view is shared by the forensic fire specialist.


20 It has also not been possible to accurately determine how long the fire had been burning before being noticed by the driver.


21 The condition of the wiring and equipment installation was not to a standard that would be acceptable for a tram carrying passengers.

Link to comment
https://www.eastdulwichforum.co.uk/topic/24671-tram/page/3/#findComment-577305
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • That's a disgusting slur against an innocent driver who was probably just on their way to drop off freshly-baked muffins at an orphanage when they had to swerve out of the way of a so-called "cyclist", and anyway traffic lights are just a Marxist conspiracy by Southwark Council to slow traffic down and force people out of cars, so we're all better off without it.
    • Frothy coffee? Not really my bag. A double espresso and a Marlboro Red? It's the breakfast of champions. The only dark drink with a creamy head which should ever be drunk by a man of my age is Guinness. I've also become lactose intolerant recently, meaning I get very impatient around milk. You make a fair point, but those legal channels are available for them to recover their repair, and legal, costs and, as I said: "It's up to them if they [Southwark] want to do that, of course." There's three or four grands worth of Cat N write-off, wrapped round a post there (more, if it's broken down for parts) causing problems. If they can't be arsed sorting that, I'm not holding my breath. Even Southwark couldn't screw their numbers up enough to make shifting the post back through circa 15 degrees more than a couple of grand, so there's a drink in it for everyone. It's a bit 'leany' just now, yeah, but I haven't noticed anyone having to limbo under it to get to Superdrugs. Or, they could make a feature of it. Pisa has made a fortune out of not sorting the underpinnings of their tower. Let's say it's an installation by someone called, I don't know, Bangsy, and it's a physical reminder that SE22 cannot deny its proximity to Peckham, Camberwell & Brixton. It's about the only thing that would get me back into The Bishop since the many dark afternoons of the soul I spent with Clarence*, the world's most depressed Weimaraner. *RIP big fella. You were always a great listener.   Come on Spartacus, don't be shy. You know exactly where the Green Cross Code Man was in 1973: less than a hundred yards away, on North Cross Road. https://youtu.be/C-XwVVMiCO4?si=rt8kQllev0t1Lgdi For some years, I found it quite difficult to go into The Forrester's after many long afternoons of the soul with Dave Prowse* (The Green Cross Code Man). *RIP big fella. You were always a great listener.  
    • Loving the arm chair speculation on here  Blimey how long before this gets spun out to be a drug dealer welding a sawn off whilst driving away from a smash and grab at the coop cash machine flipped his car and landed on a bollard type post  Where's the green cross code man when you need him ? 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...