Hi all,


There was a consultation back in 2018 for the proposed flood alleviation works in Peckham Rye which include new below ground drainage, bunds to the NW corner (Peckham Rye/East Dulwich Road), the 'Donley Ride' area to be 'developed' and the Norther Triangle section to be re-landscaped.


The proposals have now been put forward to the Planning Inspectorate to approve the application and the information will be available until the 16th November.


There have been some amendments since the original consultation but on the whole I understand why these works are being undertaken and just wanted to see what peoples thoughts were on the proposals? There are no details of when the works are likely to commence and how long they are anticipated to take which would be useful to know.


Thanks,


https://consultations.southwark.gov.uk/environment-leisure/lost-peck/


https://www.southwark.gov.uk/environment/flood-risk-management/notice-of-proposed-flood-alleviation-works-on-peckham-rye-common

I think all the proposals are a good idea. The number of times the EDR junctions severely flood in winter from water run and drains that can not cope is all the evidence needed to see that something needs to happen. Perhaps some kind of underground storm drain through the park down to the sewer would help too.

I've been told various possibly contradictory things about the lost River Peck.


One: that its course is actually lost -- and this seems quite likely since the common is very low-lying and (as everyone knows) very boggy in the winter despite new land drains a few years ago ie the Peck just seeps through the whole area


Two: that it runs under the manhole at the junction of Scylla Road and the east side of Peckham Rye.


Certainly there is a lot of subsidence on the east side of the road going south on the east side of the Rye. Every time I cycle up there I wonder what is causing the non-park side of the road to subside.


What I would really like to see is the Peck restored and made a natural feature of the Common. That may not be possible and lots of boggy bits may be the nearest we can get. Flooding is only going to increase and solutions to slow down the water and persuade it into underground aquifers will be better for all of us (and the wildlife whom we share the planet with)

Would?ve been 100% up for supporting this suggestion, glad to see they?re putting some plans into action. Let?s hope they still put part of this into action, at this time of year that section from ED road to Nunhead Lane spends half the week underwater.

The paddling pool was closed and filled in about 20 years ago. It was contaminated and the contamination was found to be coming from an underground spring.


It's the patch of wild flowers near where the road for the car park comes in, just north of the pedestrian only path.

Keep the rivet underground. Like it or not, a small minority of residents and visitors are actively hostile to beauty and nature, as can be witnessed with the litter and BBQ burning we have (the latter in summer only, granted). A made-to-resurface babbling brook sounds pretty (but a bit Marie Antoinette to me) though it?s bound to get abused.
  • 3 months later...

This is on the planning committee agenda for 22 Feb, committee being asked to approve the release of local s106 funding to allow the project to proceed.

So sounds as though things are moving along.


http://moderngov.southwark.gov.uk/ieListDocuments.aspx?MId=6685 see item 6


There?s some background info about the consultation and a map.

legalalien Wrote:

-------------------------------------------------------

> This is on the planning committee agenda for 22

> Feb, committee being asked to approve the release

> of local s106 funding to allow the project to

> proceed.

> So sounds as though things are moving along.

>

> http://moderngov.southwark.gov.uk/mgEPetitionDispl

> ay.aspx?id=500000059. There?s some background info

> about the consultation and a map.


Your link takes me through to a petition to make the closure of rye Lane permanent 😱

  • 10 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Sure, ChatGPT never ceases to amaze.
    • Chatgpt is a joy (and scary)  No Water on Barry Road" (to the tune of No Woman, No Cry) (Verse 1) No water… on Barry Road No water… on Barry Road Said, I remember, when we used to flow In the tap by the old front gate Oba served us clear, sweet water Then it vanished like fate And then the plumber would come in the evening Fixing pipes, sayin’, "Just hold tight" But every time we checked the faucet It was still a dusty fight (Chorus) No water… (no water) On Barry Road (on Barry Road) No water… yeah On Barry Road (Verse 2) I see the buckets lined up outside Hope in every pail we hold The sun be blazing, the kids be crying And the kettle’s running cold Good friends we had, and good friends we lost To the drought along the way In this bright future, we can't forget the past But we sure need water today (Chorus) No water… no flowin’ tide On Barry Road… we stand and sigh No water… but we still survive On Barry Road… we still try (Bridge) Oh, dry days will pass, I know Pipe dreams gotta start to flow But until then we wait and pray For rain or trucks to come our way (Final Chorus) No water… (no water) On Barry Road (on Barry Road) No water… no pride But still we rise… (It refused to sing it for me) 
    • Hubby had to retire from work due to serious ill health which had meant he was off work for several months at a time. His hospital consultant advised part time employment only, Signed on at Job Centre and asked them to send him on courses, especially IT has not computer literate or had a computer. Job Centre refused and insisted he applied for full time work even though he produced medical evidence from hospital and letter from previous employment detailing the reason why had medically retired him. He applied for the (then) disability allowance but was refused as not disabled enough and the fact he could work part time. Applied f or several part time jobs but when they knew of his medical history turned him down. That was 18 years ago. Disabled people who want  to work find it hard to find employment. I studied Disability and Employment in Holland as part of my degree and found at that time, the Dutch system more flexible. If a disabled person found a job part time, they still received a portion of their benefit as well as wages. If found a full time position, benefit suspended and were subject to regular reviews as to how they performed in  the job. If there were no problems, benefit was withdrawn, however if they found the work was not suited to their disability - they gave up work and went straight back to receiving their full benefit. If a disabled person finds employment, their benefits stop immediately. If they cannot maintain the work and are sacked, getting back onto benefits is very difficult, Give those who are able to work at least part time, the opportunity to have reduced benefits to top up wages.
    • Trickle of cold water this morning, but by 3 pm we have both hot and cold water with normal pressure, Hopefully this will continue.