The northern line crosses under the Thames, therefore it is important not to kill off the southern end of the line just a few stops south if the river. This extension diverts a line from its natural course further into south London, into a dead end. The plans do not leave any room for further future, expansion. As there are only a small number of lines which actually cross the river into south London, its important not to limit future development IMO.

That seems pretty weak - to turn down a real opportunity now for private funding to create infrastructure to regenerate an almost delict inner London area, in favour of non-existent plans for the future that in any case would come a long way behind other proposed projects and ambitions for the Bakerloo and Victoria lines?


It's not a dead end incidentally - it may well extend to Clapham Junction (although that would be public not private money).

It's interesting to look at Google Maps with the tube layer switched on.


There is obviously a dead zone in Camberwell. The clearest way to fix it would be to run the Bakerloo line from E&C along the A2 towards New Cross.


Naturally I would prefer it to terminate at Denmark Hill instead!

Huguenot Wrote:

-------------------------------------------------------

> That seems pretty weak - to turn down a real

> opportunity now for private funding to create

> infrastructure to regenerate an almost delict

> inner London area, in favour of non-existent plans

> for the future that in any case would come a long

> way behind other proposed projects and ambitions

> for the Bakerloo and Victoria lines?


Maybe you're right, but it proves my point that this is not strategic.

That area totally needs a tube line or some other form of extra transport - I lived there around 15 years ago before all the new developments and you could barely squeeze onto the trains from Queens Town Road or Battersea Park during rush hour. It must be impossible now. If you lived there you would be 100% behind this. It's not just for rich people, it's a very diverse area with a lot of council flats as well as the new builds by the river.

Of course you're totally right, Bumpkin. Existing transport in Battersea is limited, just like it is in our part of SE London. But one important difference (which some people haven't quite grasped) is that there are currently no plans to build 800 flats, plus extensive retail and office space, centred around an iconic national landmark in East Dulwich or Peckham.


It's also important to realise that central London is starting to expand outwards into areas like Borough, Vauxhall, and Battersea. There needs to be infrastructure in place to support this growth.

Weren't there attempts to extend from Elephant and Castle in the 1980s but the complex geology of the area made it impossible/prohibitively expensive.


And I vaguely remember Sainsbury's proposing around tha time to build a new store in Camberwell near the bus station, and suggesting the community would benefit from their agreeing to also provide some housing and also providing a new overground station in.....Camberwell Station Road (where it used to be many moons ago). BR probably wouldn't play ball, and the whole thing never got off the ground. Presumably the Dog Kennel Hill store put paid to the whole idea...and I remember that when it was green fields (Crown Estate?). Not that long ago really....

Camberwell railway station was a railway station on the London, Chatham and Dover Railway (LC&DR). It opened in 1862 as part of the company's ambitious second London railway. In 1863 the name was changed to Camberwell New Road but in 1908 reverted to Camberwell. As with many other London stations wartime restraints forced it to close in 1916.[1]


The station was mentioned in the 1956 film Private's Progress as a good place to get off a train and avoid paying a fare. It was made to sound like a working station, despite the fact that it had closed nearly thirty years before the film was set.


Today Camberwell Station Road still survives where the original station building has been converted to a garage. At track level fragments of the platforms can be seen from passing trains

Oh dear, what have I started? Quite enjoying the debate though.


"Isn't the extension privately funded?"


There seem to be varying opinions and we will not know for certain for another couple of months. I?ve been following the London transport blog below, and there is a fair amount of speculation that up to 30% - ?200m will be contributed by the developer (based on the contract drawn up with the previous developer), meaning a substantial ?public? investment (and further speculation are that this may be offset against future tax, which in real terms may leave much smaller contribution).


http://www.londonreconnections.com/2012/northern-line-extension-public-consultation-details/


I have nothing against Battersea and can see the benefit of investment in public transport in any part of South London without a tube. It would clearly be good if the Northern Line extension carried on to Clapham Junction, but who knows if this will happen in the next 100 years. Lack of a connection at Vauxhall is just mystifying. Too much of a burden on the Victoria Line is the reason given, which ignores future improvements at this station. It is also strange that a tube station is planned 400 yards short of Battersea Park NR. It just looks like bad planning, even for those living in Battersea.

As with the cable car and 'Boris' bikes, private contributions seem to rather lag public expectations, resulting in a taxpayer bill I presume:



Lord Berkeley asked the Government what is their estimate of the cost of extending the Northern Line to Battersea Power Station; and what contribution the developer of that site will make.


Earl Attlee replied that the costs of the [Northern Line] extension are not > expected to exceed ?1 billion* in outturn prices. Further design works will be required to provide a more accurate forecast of the capital costs, which will also be dependent on the timing of construction. Transport for London is currently working with the London boroughs of Wandsworth and Lambeth, the Greater London Authority and private developers to finalise the project?s funding and financing solution. The developer of the Battersea Power Station site is committed to providing ?211.6 million (this figure will be subject to indexation) of funding towards infrastructure works, as set out in its Section 106 agreement. At least 72% of this will be used to fund the Northern Line extension.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Nadia did a great job tidying up my very very overgrown yard. (See the before and after photos). I live in New Zealand and my tenants said a neighbour has been complaining about the out of control ivy. Nadia was easy to contact so over WhatsApp, managed to liaise between me and my tenants. Her quote was reasonable for the amount of work that needed doing, and the end result is great! She sent photos throughout so I could track progress. Would highly recommend her to others. 
    • My car was stolen a few months back from my driveway but I had a tracker and found it in a private car park in Lavender Hill close to the police station. I was lucky. The thieves hide it up against that eventuality. High spec cars are targeted I'm afraid. The way it was stolen required the thieves to wire in their own computer accessing a front light (which had had a metal sheet welded across which they prised off). They had searched for a tracker but not found it. They also had to cut away a steering wheel lock. They had to come well tooled up and briefed to do what they did. Beating them off is non trivial. As I said, them not finding my tracker was just lucky. 
    • Been with The Gardens now for around 30 years and very rarely do I have a problem. I went in to collect a form and mentioned that my leg was hurting and hot- was seen immediately by the Practice nurse who then arranged an appointment on the Saturday with the Extra care service at TJ Centre where I saw a doctor, who then sent me off to Kings for further tests.. I recently booked a flu jab but appointment is in 2 weeks. 
    • Have used Milk and More for years. When the price went up we cancelled a couple of pints but we still have 8 pints a week. If we are expecting family etc we buy from Sainsburys to top up. We kept on with M & M as if weather bad we could order extra stuff from them to save us a trip to Sainsburys Local. Also gives employment to our milkman.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...