Rafranks Posted June 9, 2021 Share Posted June 9, 2021 We've been having our bathroom refitted and have had some cowboy builders who have taken 2 and half weeks to remove the tiles and put the bath in (still not connected!). This should have taken two or three days maximum. As a result we're way behind schedule and need to be back in our flat as soon as possible as we're still without a working loo!If you're available for an immediate start and can turn things around in the next week, please PM me with a reasonable quote (please note that materials are mostly already here and that we're strapped for cash given the situation so far (around ?3500). Tiling of floor and bath/showerFitting of bathtub, sink/vanity & toiletPlastering & decoration of walls and ceilingsNew towel rail to be integrated in to wall with concealed pipeworkElectrical work (New extractor/new light fittings and towel rail to be dual fuel)Bathroom is a small bathroom for a 1 bedroom flat. Link to comment https://www.eastdulwichforum.co.uk/topic/286622-urgent-bathroom-fitterplumber-required-cowboy-builders-need-replacing/ Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.