Jump to content

The Dulwich Bike Meet


v79moto

Recommended Posts

The Dulwich Bike Meet, powered by V79moto


Custom Motorcycles, Curated Retail, Great Coffee & Quality Street-food!


Come join us on the first bike meet in Dulwich, where you can meet fellow riders, show off your pride and joy while enjoying some hot drinks and nibbles from local businesses.


The event will take place at the Trevor Bailey Sports Ground Dulwich Common, London, SE21 on the 26th March, 2023. Starting at 11am until 5pm.


This is a family-friendly environment, where we celebrate the world of motorcycling and everyone is welcome, so bring your family, your friends and your pets!


Carl Rosner Motorcyles will be displaying some of Triumph's latest models for your viewing pleasure!


There will be a variety of food and drinks stalls from local businesses at the ready.


Parking is available, and don’t worry, you don’t need ride a motorcycle, you can come by foot, cycle in or drive.


Book Your Free Ticket Here:

https://www.eventbrite.co.uk/e/the-dulwich-bike-meet-tickets-523098470607


We can't wait to see you there!!

EastDulwichForum-Image.jpg.cdd2c3f2a4e2d325a424fe1e7239df19.jpg

Link to comment
https://www.eastdulwichforum.co.uk/topic/322685-the-dulwich-bike-meet/
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • I wonder if DE lobbied for the pedestrian crossings at the junction if they have plans to develop the site for housing. 
    • Big black Irish wolfhound wandering around Peckham rye on the grassy area near the smaller playground (not the cafe one). Couldn’t see an obvious owner, he had a collar on and very placid but no details on collar. He wandered off (and I wasn’t in a position to stay) but please can folks keep an eye out if he’s still wandering about later in case he has been abandoned. Park ranger numbers were not working 😞 
    • I read somewhere that it was to be an Orleans Smokehouse, opening in December, which seems unlikely
    • There are "plans" to build more reservoirs, with physical work yet to be started, with the first hoped to be completed by 2036, and a second by 2040, then time is needed for them to fill so add at least another 12 months on. However, if the 1.5 million homes are built by 2028, each averaging 2 people occupying them.(some will be more, some will be less) then thats 3 million people showering, bathing and using water.  Therefore there is a massive demand that will strain our current inferstructure between 2028 and 2037 (nearly ten years) plus all those homes will need electricity, as the ambition is to phase gas usage out, which will take just as much time to reinforce the network to cover, let alone add in the ability to cope with green production electricity that needs to be moved from wind and solar farms to where it is most needed.  Therefore, is the current plan to build more homes, regardless of where they are,  potentially going to have serious ramifications on already creaking networks ? 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...