Jump to content

Recommended Posts

What's the story with buses and air conditioning? It sounds like there is something trying to happen but the windows are open and it's so hot. 

I took the 63 yesterday thinking that because its buses had been upgraded with charging points and nice seats that it would be air conditioned.  How wrong could I be?!  An hour of misery. 

Was I unlucky or is the 63 the same big disappointment as the other buses in summer?

I get the 63 regularly and so far have found the new EV buses really comfortable even in the hottest weather.

I’m fairly sure they don’t have conventional air conditioning, as this would require a separate petrol or diesel motor to power it or a considerable drain on the battery, so reducing the range of the vehicle. Instead they use a heat pump, which draws in heat from the atmosphere as required in colder weather. This should be run in reverse in hot weather to extract warm air. There is also forced air circulation.

it might be that either or these were not working. I’ve noticed that about 50% of the time on the 63, the countdown display screen on the top deck is not working. I don’t know if this is symptomatic of technical issues with these buses.

Whatever cooling system is used on a bus, it won’t have much impact when passengers obsessively open the windows, drawing warm air in. We just don’t seem to get the concept of air conditioning in this country yet. Hence air conditioned premises will often have their doors jammed open at this time of year. Pubs are the worst for this misappliance of science.

Edited by Insuflo
  • Like 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...