Jump to content

Mid century table and 2 chairs


jendeavours

Recommended Posts

Red Formica and solid wood table, excellent condition.  

Pair of matching chairs, red vinyl and majority solid wood with plywood backs. Good condition, vinyl a bit faded, one with mark to seat, plywood chipped on back of one. 

Table 72cm  H x 107 L x 59  W 

Chairs 75 H with 45 seat height

Design classics. Reluctant sale but I need a bigger table.

Pickup near Peckham Rye station

Looking for £250 but open to sensible offers

IMG-20241102-WA0006.jpg

IMG-20241102-WA0009.jpg

IMG-20241102-WA0008.jpg

IMG-20241102-WA0005.jpg

IMG-20241102-WA0010.jpg

Link to comment
https://www.eastdulwichforum.co.uk/topic/353283-mid-century-table-and-2-chairs/
Share on other sites

  • jendeavours changed the title to Mid century table and 2 chairs

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • @Sue think this is your quote.  It wasn't binary, good Vs bad, and Corbyn had a lot of popular support, as evidenced by the previous election. He had aot of good policies, some picked up by others since. He was defeated by a mixture of a right wing press,good targeting  but the Tories, 'Get Brexit Done" and for some that Johnson was a funny loveable rogue/fool/liar/philander/opportunist.  I wouldn't see perceived least worst candidate out of the two major parties as being "good sense'.  We imagine that Corbyn would have been terrible, but we don't know.  He would have taken a stronger line against Israel in Gaza, not sucked up to Trump nut on Russia?  
    • We have had 4 greyhounds - the last one, a bitch, was not speyed so we  had to pay for that at our local vet.  Only one dog was nervous around children and only one was cat friendly.
    • Apologies on the tardy reply, but thank you everyone for your responses and suggestions! Unfortunately I couldn't attend the recent EDF drinks because of work (I know right). But will absolutely keep eyes peeled for the next one and try and come down! 
    • Because of the weather which delayed completion with roofer only being able to work certain days, it was up from November - end of January. Went slightly higher than gutters (we also had guttering replaced).
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...