Jump to content

Recommended Posts

4 hours ago, Nigello said:

No, let’s be realistic and base our predictions on ample evidence. 

So let's never do anything that might improve an area, because it will just be dragged down to the level of what's presently there?

Is that what you are saying?

I don't have the time or the inclination to do the research, but I'm pretty sure that I have read  that when people who had lived in a very run down area  were given  nice surroundings, they appreciated and looked after them.

  • Like 1
  • Confused 1

I think there's a similar square-type thing around Queens Road Peckham, which has stayed in pretty good nick. It was certainly a vast improvement. 

Having said that, it would be terribly sad if small businesses suffer in the process. I love the fruit 'n' veg stalls & shops on Rye Lane, and the atmosphere in general atmosphere and very much hope that a new station square and the stalls aren't mutually exclusive. 

  • Like 1
  • Agree 3

Yes, the Council's scheme for Peckham Rye station square is going ahead and is welcomed. However, the major project for the rebuilding of the station itself to provide improved accessibility has not received government funding and is being 'paused'. There seems little prospect of that scheme now going ahead in the current Parliament. This is regrettable as it is one of the busiest stations on the network outside central London. 

  • Like 1

I know this ship has passed but I prefer the arcade. I like the Art Deco building, which matches a lot of buildings of a similar age and style all along Rye Lane. The big problem is that it's filthy. The TSB along one side has blank windows so that shop, although occupied is a dead zone and it's dirty and scruffy. Meanwhile the units on the other side are closed. If all the units had shops trading in them and everything was kept clean and shiny then the arcade would be nice. 

When you look back at Rye Lane on streetview the oldest images date back to 2008 mostly and to 2012 in parts. 

 

There was no graffiti or closed down shops at all then. It looks like a pleasant, clean and thriving high street, and the arcade around the station looks much better. 

 

What has happened to it in the last 20 years?

 

https://maps.app.goo.gl/mfaUkdzG4qZVYxFMA

 

And the state of it most recently

https://maps.app.goo.gl/ecVHvh6UwsoBt1uu6

Edited by CPR Dave
  • Agree 1

Yes, sad how Rye Lane has taken a dive, interesting to see those pics CPR Dave. It's shocking how the section between Choumert Road and the Nag's Head in particular has lost its vibrancy, meanwhile the next section to the top of Peckham Rye Common has gentrified. Wonder why such a distinction in fortunes?

Anyway the station square plans have fallen behind yet again, demolition won't now start this summer. The only "work" that will now take place this summer is surveying of the arcade, which they've had 10 years since planning permission to do. At least the replacement TSB branch has progressed but the Blenheim Grove corner building still looks unfinished, despite claims it "is now complete".

https://www.southwark.gov.uk/planning-environment-and-building-control/current-and-future-development/peckham-and-nunhead-2

Labour's latest Rye Lane Ward newsletter is now saying that demolition in the square will start this summer and that the wider station upgrade is expected to be signed off this year - as explained above, sadly wrong on both counts.

It describes the renovation of adjacent buildings on Blenheim Grove as "successful", despite having lain empty for a couple of years, longer than the actual renovation works, before saying "the Council is hopeful [it] will see its first new occupants move in to this year". Cue desperate attempt to get at least one in before end of financial year?

As for the other topic, in "November 2023, faced with a huge increase in graffiti across the borough, Labour-run Southwark council took action". Nice turn of phrase eh? Rather, after community pressure regarding years of inaction by said Labour-run council, it's finally started to do a little bit, a little late.

Surely there would be more chance of resolving issues if our council could for once be part of an honest, informed discussion?

  • 2 weeks later...
On 29/04/2025 at 19:13, Nigello said:

Great! Can’t wait for the added embellishment à la spray can, to fit in with the general Rye Lane “ambience”. 

You don't like Peckham? Why do you live here then? It is bloody disrespectful and goady, and distasteful. There is an entire community in Peckham, who have lived here for generations, quite happily. Many of whom rely on the shops on the high street. 
 

I'd say Nigel, or John or whatever your name is that YOU and your type are harming the Peckham 'ambience' alot more than some spray paint. 

  • Agree 1
  • 2 months later...

When will something be done about safe access to platforms? The overcrowding on the stairs at rush hour is ridiculous with multi trains arriving simultaneously and an inadequate staircase. Yesterday at around 5.30pm there was only room for people to descend, congestion at the bottom from three available exit barriers and a lady fell down the concrete stairs. 

  • Sad 1
On 30/10/2025 at 08:55, Huggers said:

When will something be done about safe access to platforms? The overcrowding on the stairs at rush hour is ridiculous with multi trains arriving simultaneously and an inadequate staircase. Yesterday at around 5.30pm there was only room for people to descend, congestion at the bottom from three available exit barriers and a lady fell down the concrete stairs. 

A new roadmap (surely railmap?!) for rail accessibility has been published:

https://www.gov.uk/government/publications/accessible-railways-roadmap

It says "approximately 56% of stations and around 66% of the 1.3 billion journeys that take place on the network have step-free access to platforms... 

"£373 million has been committed over the next 5 years to deliver Access for All projects, providing step-free access from station entrances to and between platforms, alongside other essential accessibility upgrades. These works, together, will increase the number of step-free stations across Great Britain from 56% to 58%.

"This improvement will make travel easier with step-free access available at stations covering an increased share of total rail journeys – from 66% up to 71%"

Don't know what that means for us here: upgrading Peckham Rye would cover a lot of rail journeys but the cost has no doubt increased from the £40m figure previously quoted. So that would eat into a lot of the funding.

  • Thanks 1

Do you believe this is actually going to happen?!

 

Demolition was supposed to start in the summer but the Labour government have pulled the plug. Even Labour councillors have had to begin petitioning the government to keep the project alive. https://www.southwarklabour.com/2025/10/03/labour-councillors-launch-petition-for-peckham-rye-station-upgrade/

It's dead in the water surely?

  • 2 months later...
On 01/05/2025 at 16:14, rollflick said:

Yes it could be a massive improvement and useful to hear that contracts have finally been awarded. I totally understand though why doubts are expressed about when the new square will open.

So work has still not started in the station square. After years of delays we were told it would begin in summer 2025, then October, then January and now just "soon" / "this year". That means the new square is not going to open this year. Pretty poor that Southwark is unwilling  to communicate any reasons for its continuing delays.

Meanwhile for the station itself, Network Rail is moving forward with a minor scheme to reduce the crush but still with no lifts: 

https://www.ianvisits.co.uk/articles/peckham-rye-station-to-get-5m-makeover-while-waiting-for-step-free-rebuild-87172/

  • Agree 1

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I was lucky that I received a student grant from 1990-1995 first 3 years for degree and 2 years post graduate bursary. Both were based on my income and I did not have to pay back. Eldest daughter got student loan and after 20 years managed to pay it off, Youngest daughter still paying hers 18 years later. Granddaughter - still paying after 6 years. Grandson decided against FE and secured an apprentenship. I am glad that I am an old codger and not young anymore !
    • Thanks Jen22 for the very kind review!  Paul and I have been Oddbodding furiously and haven't had a chance to post an updated list of jobs we've been working on until now. So here it is 🙂 Demolition of 2 sheds, removal of large patio and levelling of total area to get it ready for garden room installation Internal decoration of above garden room External sash window decoration, including fixing of rotten joints (multiple) External decorative stone porch decoration Fix of broken metal front gate Shed base installation and build of garden shed Internal plastering fixes and significant water damage fixes, including tricky corners and hard to reach areas (multiple) Rotten window sills fixed and decorated Countless shelves, curtain rails and pictures hung Baths, sinks and showers resealed (too many to count) Dimmer switches (single, 2 and 3 way) replaced in multiple rooms  Toilet seats replaced (multiple) including sourcing correct fitting seats (not as easy as you'd think) Lots of kitchen cupboard doors re hung with new hinges if necessary Ikea units built and fitted (wall mounted or otherwise) Tricky fixes to loose door handles Repairing broken visible floorboards  Mounting of multiple flatscreen TV's  Intallation of super strong (kid proof) coat hooks on walls and other useful areas (eg outsides of cupboards) Innovative conversion of open shelf spaces to sleek enclosed cupboard spaces (even when doors purchased by client don't quite fit)  Servicing of kitchen cupboard doors and units Removal of hardwearing paint flooring in photography studio, ready for reinstallation of new floor including epoxy (coming soon) Carpet removal and disposal Wooden garden gate installation including sourcing bespoken gatepost to match existing Sourcing and installation of new double glazed window pane Fence panel installation, including sourcing bespoke size and tricky fix without encroaching on neighbours land New door and window locks installed  We pride ourselves on helping our clients find the best solutions to problems and we also offer a design consultsancy service. Please reach out to Iain on +447956877533 (WhatsApp best) if you would like some ideas about home improvements or to get a quote for any jobs. You can also check our insta https://www.instagram.com/oddbods_handy_services/ No job too big or small. Oddbods do it all!   Iain Oddbod   
    • It is not only Southwark - our grandson, partner and 7 year old had a one bed council flat for years in Harlow Essex and all the properties offered were in poor condition. They eventually took a property as if they refused another one they would drop to the bottom of the Housing List. It was damp and in need of a level of renovation. Having lived in these conditions for a while they were offered better council accommodation recently, but further away from child's school. They had to pay 2 lots of rent for a few weeks as council had to undertake work in the new premises before they could move in,
    • Just had an interior decorating job done by Andy. The final outcome looks lovely and he did some remedial work at the same time to fill in gaps in the ceiling (due to previous electrical work) and to remediate any similar areas to ensure a polished overall look. Would highly recommend him for any similar job, he quoted a very reasonable price for the job as well. Thanks Andy!
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...