Jump to content

Kitchen costs


MonkeyMoped

Recommended Posts

By the number of builders' vans around here, EVERYONE seems to be getting building work done, so I'm hoping you'll. e able to give some helpful kitchen advice :-) I've seen the brilliant thread about kitchen ideas, but I'm wondering about costs.


Other than 'how long is a piece of string?' ;-) how much does is cost to get a kitchen done? I know that the quality, size, finish etc are all down to personal choice, but I'd like to get an idea of how much these sorts of things cost:


- ripping old kitchen out and taking it away

- turning a window into French doors or a nice sliding door

- installing new units and appliances

- underfloor heating

- installing spotlights


What other sort of costs should I consider? Obviously there's:


- new appliances

- units

- flooring

- lights


What else?


Roughly, what are people paying for the whole lot? I have ?20k in my head, but some money/house websites say it costs quite bit less. We're not looking for top spec, just a decent job that would last a good 15 years without dating or perishing.


Thanks a lot.

Link to comment
https://www.eastdulwichforum.co.uk/topic/36813-kitchen-costs/
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Its almost the same as Grove Vale School , now Goose Green School.
    • They used to have dedicated park wardens, who I'm sure used to look after the parks and locked and opened the gates. Years ago I knew someone who was one. I thought they were based in that hut by the toilets. Are they not there any more? The community wardens are attached to the police rather than a specific park, aren't they?
    • Yes, sad how Rye Lane has taken a dive, interesting to see those pics CPR Dave. It's shocking how the section between Choumert Road and the Nag's Head in particular has lost its vibrancy, meanwhile the next section to the top of Peckham Rye Common has gentrified. Wonder why such a distinction in fortunes? Anyway the station square plans have fallen behind yet again, demolition won't now start this summer. The only "work" that will now take place this summer is surveying of the arcade, which they've had 10 years since planning permission to do. At least the replacement TSB branch has progressed but the Blenheim Grove corner building still looks unfinished, despite claims it "is now complete". https://www.southwark.gov.uk/planning-environment-and-building-control/current-and-future-development/peckham-and-nunhead-2
    • DKH was two form entry, it is now one form entry to cope with the fact it was far more under subscribed than other schools in the area. They had actually combined year groups into single classes, 3/4 and 5/6.  When a school changes name, it’s usually because of a bad reputation perhaps the results.  The new name is dry with no history unlike its current name. It’s a very sketchy decision. It’s an expensive vanity project for someone.  What  will happen if the name change does not increase applications to the school?     
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...