Jump to content

Aqua-Build


emb

Recommended Posts

I can thoroughly recommend Aqua-Build for kitchens, bathrooms and general home improvements. Having experienced a terrible service from a local builder, we had a long list of outstanding works. Robert (07543 366231) and his crew re-installed the kitchen to a very high standard. They also carried out external pipe-work, put up blinds, installed light fittings, painted, repaired brick work, laid a wooden floor, made good the previous works, put up shelves, laid tiles, re-installed a shower and generally put our house back together! They made helpful suggestions and definitely went the extra mile. Nothing was too much problem and there was no fuss. They were good value for money. Robert will be the first person I will call for any future works.
Link to comment
https://www.eastdulwichforum.co.uk/topic/50646-aqua-build/
Share on other sites

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • If you "cotton on" and read the council announcement, it clearly states "The library will be closed from 17 November until late June or early July 2026."  https://www.southwark.gov.uk/2025/dulwich-library-closing-refurbishment
    • I’ve been seeing Lisa at goose green clinic for energy work for a year now.  Lisa is kind, caring and hugely supportive. She is wonderfully masterful and trained as a reiki master for 20 plus years. Alongside other energy work.  My time spent with her is like therapy. An emotional safe space for deep conversations and reflection followed by relaxing and energising healing work.  each experience I’ve had has been different, the end result remains the same. Feel lighter, almost euphoric and almost float home. Definitely an experience not to be missed.  https://www.goosegreenclinic.net/therapies/healing-energy-work/
    • Went there once and were not impressed when they charged £9 for one pot of Chinese tea for 2 people. 
    • What nobody has cotton onto is that Dulwich library will not be available possibly for the Council Elections in May 26. Looks as though Southwark are not confident that the work will be completed by May 26 and are scouting around to find alternative venues.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...