Jump to content

Recommended Posts

I've never had any trouble getting into Peckham Jelly Babies on a Tuesday afternoon. I try and get there about half an hour before it starts. I've heard the horror stories of having to queue up an hour in advance etc but the only time I've not got in is the first time I went and turned up at ten to (I now know of course that ten minutes is not long enough to get me and the baby changed really).

Peckham Pulse:

I usually go Friday afternoon and never had to queue up. The only time I ever had problems getting in is during school holidays. There is also the Rafts and Rascal session which you could try as it is almost the same as the jelly babies. I have been going with my daughter every week for a couple of month now and I really enjoy it although it is not necesarily that clean (just don't forget to bring some flip flops). If you have any questions just pm me.

Peckham Pule:

I usually go Friday afternoon and never had to queue up. The only time I ever had problems getting in is during school holidays. There is also the Rafts and Rascal session which you could try as it is almost the same as the jelly babies. I have been going with my daughter every week for a couple of month now and I really enjoy it although it is not necesarily that clean (just don't forget to bring some flip flops). If you have any questions just pm me.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...