Jump to content

db124

Member
  • Posts

    13
  • Joined

  • Last visited

  1. Three-four posts and three panels to be removed and replaced. Current Posts are in the ground in post anchors. New posts need cutting to size and putting in to new concrete. New panels to be held by clips. One panel will have to be cut to fit. Each panel to have gravel boards underneath. All posts, panels, concrete etc ready to go in - just looking for someone to do the job tomorrow! ?150ono... Thanks for looking.
  2. Three-four posts and three panels to be removed and replaced. Current Posts are in the ground in post anchors. New posts need cutting to size and putting in to new concrete. New panels to be held by clips. One panel will have to be cut to fit. Each panel to have gravel boards underneath. All posts, panels, concrete etc ready to go in - just looking for someone to do the job tomorrow! ?150ono... Thanks for looking.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...