Jump to content

Chris82

Member
  • Posts

    3
  • Joined

  • Last visited

Everything posted by Chris82

  1. Bic Basher Wrote: ------------------------------------------------------- > Southeastern no longer manage DH, the current > operator in charge is Thameslink/GTR. They manage > all stations on the Catford Loop with the > exception of Peckham Rye (Southern). I know, I didn't say Southeastern did. I think stations are generally managed by the operator running the most services, though it can become a bit arbitrary when there are several operators with a similar number as at Denmark Hill. However, if Southeastern is devolved to TfL then they will be responsible for a majority of the services there and I would expect them to ultimately take on management of the station.
  2. d.b Wrote: ------------------------------------------------------- > First, as you might have seen at other stations, > these kind of side gates aren't always open. > Typically they are open for either late > nights/sundays when the station office may not be > manned, or rush hour when numbers are much larger. > Most other times side gates are closed so people > are forced through barriers for better enforcement > of ticketing. This covers e.g. the 4-5pm after > school window. > > Second, the barriers at denmark hill are usually > set permanently open during rush hour periods > anyway to try and prevent further chaos while > hundreds of people are crushing through two > barriers. N.b. it has been particularly awful the > past couple of days since one of the barriers > isn't reading oyster properly. Thanks for this. I had thought about this before writing my original post, but I thought the gates were sometimes closed during rush hour at Denmark Hill. However, I've not been commuting consistently in rush hour for a while since I've been ill, tending to go between 9.30 and 10.30 a lot. If you're right then there's nothing to lose. Hopefully TfL will be our saviour on this. I don't think they will automatically be rebuilding every station, but with Thameslink allegedly going to 4 trains per hour eventually, Overground to 6tph and Southeastern improvements following devolution, there really might not be any other option to cope with numbers but to extend the entrance.
  3. I agree with most of the comments made about Denmark Hill station. As someone with a serious health condition using the station can be extremely stressful when it's very busy. That said I do rather like FCB's coffee! If the closure of the ticket office goes ahead (which in itself is a shame...) then I hope they won't just be leaving it empty but will reconfigure the space within the building to allow a wider entrance and more room for ticket machines. You think a modern 'box' like that new station (as awful as it is) would be fairy easy to adapt and extend, but perhaps not... The additional entrances people have mentioned would make a lot of sense, though I think 'gating' stations is a big priority for operators - particularly TfL/London Overground who are likely to be running the station in a few years if Southeastern is devolved to them - and so I don't see this happening. Fortunately TfL also take station improvements more seriously than the other train operators and so perhaps they will be more likely to invest in improvements.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...