Jump to content

Final tickets remain for 'Song of the Sea' by the poolside, JAGS Sports Club, 16th Dec, 5pm


Recommended Posts

JAGS Sports Club is thrilled to be partnering up with East Dulwich Picturehouse once again, for a special family screening of 'Song of the Sea'... but this time by the poolside!


Prepare to be enchanted by this beautifully animated film and enjoy the unique setting and reflections of the stunning pool.


?1 from each ticket will go towards crowdfunding for Dog Kennel Hill Adventure Playground. The Dog Kennel Hill Adventure Playground is a hugely important local facility for kids and is used by children across many local schools, nurseries and groups... http://www.dkhap.org.uk


To book tickets, please click here: https://ticketing.us.veezi.com/purchase/273?siteToken=13wpdz0265txd2edcrq7ysw57r


Bring a cushion and expect mulled wine and hot dogs!


Rating: PG

Date: 16th December

Times: 5pm start


For more information on the film visit: https://www.theguardian.com/film/2015/jul/12/song-of-the-sea-review

  • 2 weeks later...

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Big black Irish wolfhound wandering around Peckham rye on the grassy area near the smaller playground (not the cafe one). Couldn’t see an obvious owner, he had a collar on and very placid but no details on collar. He wandered off (and I wasn’t in a position to stay) but please can folks keep an eye out if he’s still wandering about later in case he has been abandoned. Park ranger numbers were not working 😞 
    • I read somewhere that it was to be an Orleans Smokehouse, opening in December, which seems unlikely
    • There are "plans" to build more reservoirs, with physical work yet to be started, with the first hoped to be completed by 2036, and a second by 2040, then time is needed for them to fill so add at least another 12 months on. However, if the 1.5 million homes are built by 2028, each averaging 2 people occupying them.(some will be more, some will be less) then thats 3 million people showering, bathing and using water.  Therefore there is a massive demand that will strain our current inferstructure between 2028 and 2037 (nearly ten years) plus all those homes will need electricity, as the ambition is to phase gas usage out, which will take just as much time to reinforce the network to cover, let alone add in the ability to cope with green production electricity that needs to be moved from wind and solar farms to where it is most needed.  Therefore, is the current plan to build more homes, regardless of where they are,  potentially going to have serious ramifications on already creaking networks ? 
    • SDCAS is doing important work and needs our help - please consider supporting them at this difficult time. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...