Jump to content

Forensic drama series in E' Dulwich - video/offline editors Rqd


Recommended Posts

** Voluntary 'budding short film / offline editors Required' **

The stages of progression will be Alpha, Beta then to Pilot.



** Project **

The Drama series is a cross between 'Spooks', 'Hustle', a lot of martial arts with the setting in and around E'Dulwich + London and wider.



** YOU! **

Making the entry basis level, I'm looking for individuals who have made at least 2 x 3-minute short films that have made people laught, inspired or clinching onto their seats due to the horror aspect.

a) Using an i-phone or similar, or an entry level video camera

b) Editing suite, also at an entry level with thoughtful noddy shots

c) This is a start-up with zero funding, so looking for individuals with passion, knowledge, to work in a team.



** Me **

- 13-years Criminal Forensic Science, 12-years running a Californian tech security company in London, etc..

- Mulitple years with off-line video editing, filming, enhancement.

- Passionate about 'Start-ups', team building and getting new/different things moulded and moving.



** Where are we Now? **

- Currently at 'Alpha' phase, so you will be part of the originating team.

- I have 3 high-level story boards.

- The next stage will be looking at actors, writers, continuity etc... .

- Vision based on landmarks through forensic investigation.



** What if 10 apply? **

If all the 3-minute films are great, then it can make development of this project GREAT!


** Contact **

[email protected]




Best!


freestyle-McCabe


BTW - this has been moved from another session of the EDF

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • I read somewhere that it was to be an Orleans Smokehouse, opening in December, which seems unlikely
    • There are "plans" to build more reservoirs, with physical work yet to be started, with the first hoped to be completed by 2036, and a second by 2040, then time is needed for them to fill so add at least another 12 months on. However, if the 1.5 million homes are built by 2028, each averaging 2 people occupying them.(some will be more, some will be less) then thats 3 million people showering, bathing and using water.  Therefore there is a massive demand that will strain our current inferstructure between 2028 and 2037 (nearly ten years) plus all those homes will need electricity, as the ambition is to phase gas usage out, which will take just as much time to reinforce the network to cover, let alone add in the ability to cope with green production electricity that needs to be moved from wind and solar farms to where it is most needed.  Therefore, is the current plan to build more homes, regardless of where they are,  potentially going to have serious ramifications on already creaking networks ? 
    • SDCAS is doing important work and needs our help - please consider supporting them at this difficult time. 
    • Cheers for that. Surprising to see it's over 25 years since it closed.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...