Jump to content

Recommended Posts

Google isn't coming up with much and I wanted to contact someone responsible for the station regarding the large cracks in the walkway up to platform 2 (with the building works next door, worried it could give way at some point?) and also the large nettles and brambles growing by day on both platform walkways that soon will be taking over and people will get injured (and worried about the nettles and brambles being at small child head-height).


Anyone know of any contact details? I know years ago the manager had a thread on here but it's no longer used.

Thanks

Hi Ginster,

All works within 10m of railway land have to be agreed with Network Rail. They are incredibly hard to work with - from my work experience over a number of projects/years. We always moved heaven and earth to find solutions that didn't need Network rail agreement.

At one point I met with Network Rail about this development to see if the developer could deliver a new ticket office, lifts, etc. Sadly Network Rail wouldn't talk unless ?1M was stumped up first to reinforce the railway embankment.

Working with the rail company was much more successful getting the final ramp put in place.


Network Rail will be all over this. The required permissions would take minimum 6 months to obtain. Network Rail will be monitoring this.


Nettles and brambles are the train operating company responsibility.


I've contacted the TOC and related both issues asking they come back to me when they'll be fixed.

And Southern have responded speedily by trimming back the greenery, I see ? although simply pulling up or cutting it would be better than spraying, but hey-ho. Also, the cracks leading down from platform 2 have been marked out, so hopefully some action there too.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...