Jump to content

Recommended Posts

Hi Ian... the first thing I did was to look up the roadworks on this useful link, but all I could see was the services installation on the Melbourne house, as per above.


But, I just looked now and I could see the notice of an SMA patch in the road on EDG, which is basically a form of heavy tarmac to address the sinking of the existing road surface.


So, it does look like there were several things going on at the same time... it appears that the public notices were just slow to be publically posted and officers difficult to contact.

On Saturday Tooley Street SE1 returns to two-way working.

From Monday Tfl has advised me London Bridge will be closed to motor traffic. Buses, people cycling and walking will still have access but other motor vehicles will be diverted via Tooley Street to Tower Bridge.

Details of the London Bridge closure:


From Monday 26 February, until mid-March, London Bridge will be closed northbound on weekdays only, while Cadent (formerly National Grid Gas) carry out emergency gas works on nearby Gracechurch Street.



The restriction does not apply to local buses, taxis, cycles, pedestrians and emergency vehicles.


While this closure is in place, motorists are advised to use Blackfriars or Tower Bridge to cross the river.

uncleglen Wrote:

-------------------------------------------------------

> rendelharris Wrote:

> --------------------------------------------------


> Your petty ridiculousness leaves me speechless rh


Hurrah! Long may it last. You claimed that the works in Oval/Kennington were obviously part of Southwark council's end of year road spending spree, if you object to it being pointed out they're in Lambeth try getting your facts right in the first place.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • This is the right sort of response from the BBC (Friday night comedy).  Well done.  Please listen before commenting. https://www.bbc.co.uk/sounds/play/p0mfx7h4  
    • On Tuesday and Thursday this week, the pool was very cold!
    • Found Amex card on Goose Green. PM with your name and the last 4 digits of the card number if you think it might be yours. 
    • I’m not sure the problems were caused by Everyone Active. They run perfectly good centres elsewhere, including the Queen Mum which until recently was my main pool. As far as I can remember the problems with the Dulwich pool started months after it was handed over to Southwark. But I might be wrong on that. I think there was a period when EA weren’t investing in it, pre hand back to Southwark, which is not surprising, but it was maintained to legal standards, I’m sure. I tried to swim at Dulwich a couple of weeks back. The water is far too hot. I would say it’s bordering on dangerous. I’m sure it’s within the tolerances etc but it is significantly warmer than JAGS (warm but still ok for session swims) which itself is way warmer than any of the other pools I swim at (Queen Mum, St Pancras, Oasis). I do wonder if all the problems they had with filters are related to the temp of the water. Peckham Pulse and Camberwell aren’t hot  so I think it’s a manager decision to run Dulwich so hot. Appreciate that the pool temp has nothing to do with the showers.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...