Jump to content

Recommended Posts

I picked up a leaflet at London Bridge station last week with details of all the exciting improvements that lie in store for us, in the run up to the "new" station being completed in 2018!


One of these is that from May 2013 platforms 14-16 are going to be taken out of service for a couple of years. I guess that means that they'll be down to only 13 platforms.


Fewer platforms seems likley to mean fewer trains. Does anyone know if that's the case and if so can we expect a reduced service into London Bridge station?

Those are the platforms for ED trains (plus 13) so I'd also be interested in any new schedule plans for that period.

14/15/16 platform are at end of the station - maybe they're renovating/rebuilding the offices at that end of the station ?

Overhaul is going good so far - makes me realise how used I'd got to the place being such a shithole.

The new timetable starting 9 December will see more evenly spaced trains East Dulwich to London Bridge but the same overall number:


7.09,20,30,40,50

8.00,10,21,30,40,51

9.01


as opposed to current:

7.05,15,29,34,46,57

8.04,15,27,33,45

9.00


Hopefully when all the London Bridge works are finished they can then provide more trains on our line which from my experience very over crowded. But I'm hot holding my breath as the results of all the works will see exactly the same number of platforms - currently 6 through and 9 terminating changes to 9 through and 6 terminating.

Thnks for that information James, but what's going to happen to the service to and from London Bridge as from May 2013 when platorms 14-16 close and there will be 3 fewer platforms available for trains? What's more, these 3 platforms are of course those most used by trains passing through East Dulwich.


Plus, for how long are they going to be out of service? The leaflet I picked up was silent on this - but implied that it would be for a long time!


I fear a reduced service to and from London Bridge, for quite some time.

"May 2013


"Platforms 14, 15 & 16 at London Bridge close to enable redevelopment work. This means platform changes and the retiming of some Southern train services.


"Spring 2014


"The first two redeveloped platforms open at London Bridge (14 & 15) with new longer canopies to protect passengers from the rain."


[ copied from http://www.thameslinkprogramme.co.uk/about#keydates ]

katgod Wrote:

-------------------------------------------------------

> No trains Lb to cx for 2 years is a big concern.

> Don't think the Ell will help with that at all.


It's a year for each station. Charing Cross in 2014/15 and Cannon Street 2015/16.


The ELL will provide alternative connections to continue your journey, more likely from Canada Water using the Jubilee line which will connect with Southwark for Waterloo East and Waterloo for the Northern/Bakerloo to Embankment and Charing Cross.


As seen with the extension to Forest Hill and Honor Oak Park, passengers changed their travelling patterns to Canada Water instead for the easier tube connection into Central London.


London Bridge doesn't need all the passenger traffic during the refurbishment works, so the extension will help to relieve passenger flows already from the Sydenham line and soon from the SLL.

Bic Basher Wrote:

-------------------------------------------------------

> katgod Wrote:

> --------------------------------------------------

> -----

> > No trains Lb to cx for 2 years is a big

> concern.

> > Don't think the Ell will help with that at all.

>

> It's a year for each station. Charing Cross in

> 2014/15 and Cannon Street 2015/16.

>

> The ELL will provide alternative connections to

> continue your journey, more likely from Canada

> Water using the Jubilee line which will connect

> with Southwark for Waterloo East and Waterloo for

> the Northern/Bakerloo to Embankment and Charing

> Cross.

>

> As seen with the extension to Forest Hill and

> Honor Oak Park, passengers changed their

> travelling patterns to Canada Water instead for

> the easier tube connection into Central London.


The ELL isn't the best alternative for people travelling from East Dulwich station. It makes more sense to travel to London Bridge as normal and then take the tube (e.g. jubilee line or district) instead of the CX link.

GLA Assembly Member Caroline Pidgeon has forwarded a Network Rail email that states:


"

At this stage, we don?t know the exact changes to service patterns. The only line we know changing on the Southern side is the removal of the South London Line. The rest will see some re-timing, re-platforming and some small incremental changes to individual services. This will all be done through the standard timetable changes in May and December. These small changes will be covered by increasing the length of certain trains and reorganising the way Southern runs its drivers and station operations to improve turn around times and dispatching. Unfortunately we can?t say for sure which train services see some small losses in trains as of yet, these will be worked out with the timetable changes.


The thinking behind the recent communications push is to get passengers thinking about these expected changes and share the info we have with them. We?re advising passengers to sign up to email alerts through the Thameslink website www.thameslinkprogramme.co.uk so we can keep them informed once details of service patterns are confirmed. They can also email us at [email protected] Besides these communication channels, we will be organising further engagement activities with commuters like the current roadshow when the service changes are confirmed.

"


A further complication is a Judicial Review of the London Bridge Planning Application:

http://www.out-law.com/en/articles/2012/june/london-bridge-development-subject-to-high-court-challenge-by-community-group/

My hunch is it will win. Starting a JR is very risky unless you're sure you've a very strong case - costs can be awarded. If this JR is won then it should stop works as the Planning Application process would have to be undertaken again.

Personally I think the proposal for London Bridge are rubbish and rail users should have a better scheme.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • To add, Ultimately the problems and remedial action go back to the landlord and the agents (Foxtons in this case) have to refer everything back to the landlord and get the landlord's consent to act, including instructing trades to undertake repairs. The landlord may be the underlying problem. Suggest use the above links and escalate, including sending written notices to both the agents and landlord direct. The landlord details should be stated in the tenancy agreement. For complaints / faults, make sure you have a written record including follow up in writing / email on all calls.
    • Absolutely mental what Labour have become/are doing  because I’m me - I am going to say, it was the denial of reality that was the 2016 referendum, the genuflection of it ever since and the aggressive behaviour of the right wing press ever since that have cowed weak, spineless politicians  Until them at shibboleth is defeated, we can replace governments and leaders as much as we want - won’t make a tack of difference  we are in bizarro world since 2016 - only the electorate recognising that vocally will we see improvements  without that, every government, party and leader will be in hock to fantasists  (there are things govts can do regardless of Brexit. Of course there are. But the root - the root problem - will continue to infect)
    • I wrote to Ellie during Labour conference due to their continued focus on the boats telling her that most of my friends and family believe there are more important things to focus on than the small boats.  That does not mean it should not be addressed, but sadly this has become a toxic issue stirred up by Reform, the right wing media/rabid social media, to a lesser extent Bedenock and Philp, and sadly Labour itself.  Mahmood's statement today that illegal migration is "tearing the country apart" makes me shudder.  All credit to Plaid Cymru for their stance in the Caerphilly Welsh Parliament by-election. PM and Home Secretary you are encouraging this.  Just repeat after me "as a country we are better than this". Well perhaps some will think that I live in a liberal bubble and I am not in touch with the 'common people".  I'd like to think we are all better than this. And that includes the other culture wars that Reform will continue to stoke up including Diversity, Equity, and Inclusion, and gender politics.    
    • Local councils in England have significant powers to take action against unfit housing [and my own words rather than AI - have a duty to take action], primarily under the Housing Act 2004 and the Homes (Fitness for Human Habitation) Act 2018. These powers are used by environmental health or private sector housing teams and typically follow an assessment using the Housing Health and Safety Rating System (HHSRS) Here's more details from central government: https://www.gov.uk/government/publications/homes-fitness-for-human-habitation-act-2018/guide-for-local-authorities-homes-fitness-for-human-habitation-act-2018 If Southwark are not responding, next port of call is your local councilor - having been at MP's surgeries a few times much of their constituency time will be taken up with issues like yours. The oven thing is just bizarre - reminds me of what landlords would do when I was a student.   Shelter also provide guidance.  You should serve notice on your landlord, but I'd go to Southwark at the same time https://www.southwark.gov.uk/housing/private-tenants-and-landlords/private-tenants/your-rights-and-responsibilities/unsafe-and Others may be able to advise on whether your house has to be licensed.  If you change the title to "advice on unfit rented property" you may get more offering advice. Finally contact the Waterloo legal advice centre for free advice: https://www.lawworks.org.uk/legal-advice/individuals/waterloo-legal-advice-service Lawyers give up their time (pro bono) to help those in particular need. Good luck and keep this thread updated.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...