Jump to content

Recommended Posts

Hmmm, it looks fab, but would like to see a real life review, eg is it sturdy and does the stuff really sift through all the different layers, or would everything just pile up at the top. It also depends on all the lego being broken up into bits, which can be as time-consuming as picking it up.

It's quite sturdy - the lid is a bit flimsy but fine (you wouldn't want to sit on it), and I find the pieces really do sift down. My kids tend not to pick bits apart, but more because they like to take what they've already built and add to it, so these bits stay on the top layer.


It makes it so much easier to find small pieces, and keeps it all a lot more ordered. My kids have played with the Lego more since we got it as I don't think they find it as overwhelming as before.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I completely agree.  Mickey did some work for a couple I know and from this, I asked him to do some plastering for me.  He works to a really high standard, is reliable, fair priced and very clean and considerate.  He does the work himself, so you do not get random people coming to your home.  If you are looking for a trades person MJ Lawless Plastering Services is your person.  His number is 07930 678 989
    • Current status of Planning Application 24/AP/2314 is the approval document was published 31 December 2025 with effect 1 January 2026.  https://planning.southwark.gov.uk/online-applications/files/E5F5EC6005598720843BC00D7E6A7D11/pdf/24_AP_2314-DECISION_NOTICE_-_MAJOR_-_GRANT-4194604.pdf It has 41 conditions many of which must be confirmed via further applications into Southwark Council before works on site can begin. I've not seen any applications to start discharging those conditions yet - amazed some of these have not been prepared by the developer. No work of any kind is allowed on site until some of those conditions are discharged. Additionally the sites proximity to the rail tracks means Network Rail will have to be heavily involved. My work experiences with Network Rail would suggest quite some delay will come rom them alone.  With the national government and Southwark Council planning to reduce the proportion of social housing from 35% to 20%, and some schemes in Southwark are now only provided 2% social housing. It would be amazing if the developer doesn't seek an amended viability appraisal to reduce social housing for the scheme or even taller buildings.
    • I did the same on a bus.  The whole bus cheered!  The religious nut shut up.  It is not acceptable for people to try and force their beliefs on you
    • Hello    Any one selling a second hand coshh cabinet?    Thanks xx 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...