Jump to content

Recommended Posts

I listened in on the relevant meeting and understand that it?s a feasibility study that has been commissioned on the EDG/ LL crossing (which they can?t meaningfully do until the tail end of the year when decisions have been taken on the local LTNs). The amount of money allocated in the recent round of funding is far short of what they would need to install a crossing here.

Serena2012 mentioned above and

legalalien added:

--------------------------

> I think I heard somewhere that the

> funding is for a feasibility study

> rather than putting in the crossing

> at this stage. But I'm not sure where.


That seems to me more likely, given the ascribed cost of ?12,000 and the list of project types that can be considered, at page 40 of the South multi-ward forum Public report pack available at http://moderngov.southwark.gov.uk/mgChooseDocPack.aspx?ID=6871:

5. Commencing in 2017/18, the scope of the fund has been widened to

permit the full range of minor traffic and highway capital schemes rather

than solely like-for-like repair and replacement. Examples of the types

of works which can now be funded include:

? Footway and carriageway resurfacing;

? Traffic calming;

? Localised repairs;

? Accessibility improvements;

? Footway buildouts;

? Cycle hangars.

heartblock Wrote:

-------------------------------------------------------

> Cycle lane EDG .... yes please. So many cyclists

> on this road, please make it safer for them. The

> crossing will be great, that junction is so

> dangerous for us pedestrians.


Totally agree but until dulwich routes are open again is there enough room for bus and bike lanes?

Cycle lane.. not along all of it, but probably from the bend up to the crossing, so from where the Dutch estate starts up to the Half Moon crossing, take off street parking away from the left hand side as not used so much after the parking zone, there is unused parking on the rail track side of the Dutch estate that could be opened up to local residents- but yes EDG is very busy with traffic due to the 4 LTNs so opening those roads would be better for cyclists generally. Unfortunately the LCC will not agree......

Sue Wrote:

-------------------------------------------------------

> It's weird, because if memory serves they have

> being saying for years that it was not possible to

> have a crossing there.

>

> I can't remember their reasons.


This is where (according to a Google search) they got to last time. I suspect the consultation was canned due to Covid-19. Many of the previous issues re: visibility of the crossing; the fact that the lights on Lordship Lane, South of the junction are in the wrong place; the narrowness of the pavement & TFL objections in view of potential delays to bus journey times are likely to persist, hence why a feasibility study as opposed to a solution is what is currently being proposed: https://www.whatdotheyknow.com/request/status_of_request_for_pedestrian

kford Wrote:

-------------------------------------------------------

> Traffic will be backed up to Heber Road with

> lights there


People said there would be problems with the two (then) new pedestrian crossings in Lordship Lane, but to the best of my knowledge there haven't been any issues?

The crossings' reds aren't on for as long as they would be for the two ways at that junction, which would presumably also have a right filter green from LL plus an all-green pedestrian cycle.


Sue Wrote:

-------------------------------------------------------

> kford Wrote:

> --------------------------------------------------

> -----

> > Traffic will be backed up to Heber Road with

> > lights there

>

> People said there would be problems with the two

> (then) new pedestrian crossings in Lordship Lane,

> but to the best of my knowledge there haven't been

> any issues?

Just to add that I don?t think the introduction of a signalised crossing at this junction is guaranteed. When presenting this, Charlie Smith implied that they were also contemplating a zebra crossing. Whatever ends up being proposed will need to be discussed with TFL and is likely to be subject to public consultation.

Sue Wrote:

-------------------------------------------------------

> A zebra crossing would maybe work, but cars often

> just ignore the fact that a pedestrian is on the

> crossing.

>

> Also, on busy days, cars would never get over the

> crossing!


It?s far from straightforward, which I?m guessing is why it?s been debated for years and yet no panacea has been identified. It will be interesting to see what comes out of the feasibility study.

The thing is, like the terrible dangerous (for pedestrians) junction where the South Circular meets the continuation of Lordship Lane by the derelict pub, if someone was killed or seriously injured here, they would come up with a solution PDQ.


Speaking of which, I thought it had been agreed to install pedestrian crossings at the South Circular junction. Does anybody have an update on that? I can't remember what the timescale was.

During my time as a Councillor we looked at this several times. We even had a report commissioned by Southwark Council. Hopefully they won't blow money repeating it!

To put traffic lights there we were told Lordship Lane would have to have no parking from Goose Green roundabout to outside the Coop. Even then it was extremely likely TfL London Buses would block such lights.

It would also mean pedestrians having to wait uptimes o 2 minutes to cross East Dulwich Grove. Effectively downgrading the pedestrian priority.


The Pelican crossing and raised junction was an attempt to get some improvement. My lot thought a Zebra crossing right on the pedestrian desire line was needed - probably with a pavement build out into Lordship Lane. This would maximise pedestrian priority.

TfL 'tentatively' aspires to commence work on the Lordship Lane/Dulwich Common junction (aka The Grove Tavern junction) in 2020.


Though, given the government's just getting started on another round of austerity and spectacularly raised the bar in terms of dismissable deaths, I strongly doubt they're doing much more than waiting for the money to run out. It is, after all, a fairly expensive project as it doesn't just involve nailing a button to a lamp-post but building four separate staggered walkways which are necessary, I gather, if pedestrians aren't to get the impression that their time is as valuable as anyone else's.


We have, after all, been here before, with an approved, and fully-funded, improvement project all signed and sealed and teetering on the brink of actuality until it all magically evaporated when our dear friends and neighbours chose to elect Johnson as our mayor. A surprising number of people, it seems, would prefer children not to access nature until they've had a good chance of being killed or injured first and, perhaps unsurprisingly, their arguments seem to hold weight in all the best corridors of power.

DulwichDaddio Wrote:

-------------------------------------------------------

> If this is an example of good news, then the OP

> must lead a really, really boring life.



Ah, a "new" poster, just joined under this name today.


How lovely. Wonder how long it will be before this incarnation gets banned?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Another recommendation for Dulwich Test and Services Centre. Only been using them for a couple of years but wish I’d found them earlier 
    • A new roadmap (surely railmap?!) for rail accessibility has been published: https://www.gov.uk/government/publications/accessible-railways-roadmap It says "approximately 56% of stations and around 66% of the 1.3 billion journeys that take place on the network have step-free access to platforms...  "£373 million has been committed over the next 5 years to deliver Access for All projects, providing step-free access from station entrances to and between platforms, alongside other essential accessibility upgrades. These works, together, will increase the number of step-free stations across Great Britain from 56% to 58%. "This improvement will make travel easier with step-free access available at stations covering an increased share of total rail journeys – from 66% up to 71%" Don't know what that means for us here: upgrading Peckham Rye would cover a lot of rail journeys but the cost has no doubt increased from the £40m figure previously quoted. So that would eat into a lot of the funding.
    • It's not really though, is it. It's practical.  At least we're allowed Christmas lights.
    • We are the only specialist floor insulation company on the market to focus on insulating from below – meaning almost zero mess, disruption or noise! Warmdwell is extremely proud to receive the highest reviews for our professionalism, reliability, commitment and the all-round ease of doing business with us: we draw our team from professional, creative, educated backgrounds to provide a friendly, problem-solving team with the deepest integrity. We take real care of your home and aim to leave it as spotless as possible. Please check our Google Reviews to speak for us: "We were really pleased with their quote, communication, and with having the job done perfectly with almost zero disruption. We think they left the space cleaner than when they arrived, and we are definitely already getting the effects of a warmer room" – Miriam & Abed, Sevenoaks, Oct 2025 "Laurence and his team were extremely polite & helpful, and the work was performed over just 2 days with minimal disruption. It was absolutely the most relaxed work I have ever had performed on the house!" – Alistair, Cambridge, July 2025 "Extremely friendly, polite and efficient" – Diane, Forest Hill, June 2025 We are always keen to chat through your floor insulation options and provide as much free advice as we can, as well as free quotes and surveys – so why not ask us today about what is possible to protect your floors from the cold ventilation air blowing underneath, keep your heat in and warm up your home? We use high-performance mineral wool slabs, never foam, for so many reasons: it is the ideal flexible material for the irregularities of old floors; is breathable, working with the way your floor has successfully performed for perhaps 100 years or more; can easily be removed to access pipes and cables; and is completely non-combustible. A local business based in Crystal Palace, we work extensively around Dulwich, Herne Hill, Forest Hill, Lewisham, Tooting, Balham and across the south East of England. Please ask us about your floor insulation options or for local project case studies today! Phone Number: 02080792793 Email Address: [email protected] Website: https://warmdwell.co.uk/ View full listing
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...