Thames Water have written again stating the works are being delayed and will now commence on Monday 26th April for (12) twelve weeks.




Thames Water begin water mains renewal works on Forest Hill Road for (12) twelve weeks, starting 12th April, this coming Monday.


The Transport for London website states;


"FOREST HILL ROAD, SE23: Due to roadworks, from 19:00 on 9 April to 19:00 on 7 May, Route 63 buses will be starting and terminating at Peckham Rye."


Am assuming that the 363 will divert Lordship Lane, Barry Road, Peckham Rye both ways as was previously the case when TW repaired the burst on Forest Hill Road earlier in the year and subsequently when they worked on Woodvale.


Currently no disruptions reported on the TfL website for the 363, so it may be running??


Effectively from Forest Hill Road, those that rely on public transport are isolated. No prior warning or consultation with local residents who will be affected by these works by TW. I would further suggest traffic will become significantly worse with motorists seeking alternative routes to avoid Forest Hill Road. It will be of great inconvenience for those wanting to get to Peckham or further North, or for any appointments at Kings College Hospital, particularly as we are still within the pandemic.


The named contact on the letter for any questions is [email protected]

Thanks for this. This is a continuation of the water main replacement works along Underhill, Melford and Wood Vale that have been going on for the last 6 months. Hadn?t realised they were going down FHR. To be fair, the Thames Water team have been pretty good at keeping traffic and pavements as free flowing as possible and were really good about keeping residents informed about water outages and traffic closures so hopefully that continues. But appreciate the heads up re the 63.


Marginally less impressed that the last phase of Thames Water works managed to crack our local gas pipe/main on Underhill/Melford so that now needs to be replaced (another 6-8 weeks of roadworks) but hopefully that lesson has been learned!

The letter states;


"our work on Forest Hill Road will start at the junction of Woodvale. We will then be working on Forest Hill Road in 100 meter sections to the junction of Mundania Road.


To complete our works, we'll have lane closures in place on Forest Hill Road supported by 2 way traffic lights.


A 3 way traffic light system will be in place on Forest Hill Road when our works are at the junctions of Marmora Road, Therapia Road and Mundania Road."



+Ve - The TfL website still shows NO diversion for the 363, (thankfully) and still running along Forest Hill Road.

It'll be chaotic.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Our cellar was damp constantly and we were told that there were many underground streams in Dulwich (which eventually end up in the river in Belair Park),  Agree it is connected  to the water table. We had all old plaster removed from walls and replastered, 
    • Andy did a good job for me doing up a flat - bedrooms, bathroom and kitchen for a very reasonable rate. He’s a top notch painter and decorator and can turn his hand to many other trades too. I’d highly recommend him - nothing was too much trouble.
    • A ramp would not be suitable for Love Dulwich. Gradient would be too steep, also length of ramp would go into road. We considered a ramp in the house to get down 2 steps (internal) but an OT who measured said we would need a clear space of around 9 feet plus because of the height of steps.
    • Over the past few months, Jan from Silver Fern Landscapes has completed several projects for us.  (He was recommended by a neighbour.)  We have been very pleased with his work.  Some details are below: Built and replaced several trellis fence panels.  In one part it was very complicated due to a large vine that had grown into/around the trellis.  He was able to save the vine, having unpicked it from the old trellis and then securing it to the new.  The vine went into a bit of shock, but is now thriving. Repaired the top frame to our garden side-return door, replacing rotten wood, and repainting the new to match. Repaired the loose tiles in our front walkway Along the way, during his visits, Jan also gave advice on various topics, such as how to best care for: our recently re-planted lawn, a tree that lost a large branch, and the vine mentioned above.  His working style is straight forward...he shows up when he says he will, discusses what needs to be done, provides timely quotes, completes the work as agreed, and sends an invoice. No drama, no hassle.  We will definitely be calling on Jan again when future garden-related projects arise! silverfernlondon.co.uk/silver_fern_landscapes.html
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...