Jump to content

Recommended Posts

Minor Road works  have been drifting along seemingly for months outside West Dulwich station causing massive tail backs and severe pollution on the South Circular and Croxted Rd. There seems to be no control  or sense of urgency whatever with what appears to be a meandering exercise to fiddle around with a couple of traffic islands. What is going on.??  Why are we governed by such half wits?

 

 

 

 

Link to comment
https://www.eastdulwichforum.co.uk/topic/328585-road-works-shambles/
Share on other sites

It seems ironic that we are all being shafted by the mad net zero obsession whilst local indolent highways jobsworths can still create massive delays and  pollution when ever and where ever they choose by dreaming up yet another expensive and unnecessary road excavation.

  • Like 1
  • Confused 1
21 minutes ago, CPR Dave said:

Is it the Labour Council or the Labour mayor you are calling a halfwit?

Both. In my case. If the work needs doing it should be done quickly. A few years ago the South Circular could have been closed (possibly just for a couple of days, or even over-night) and a diversion put into place to allow the work to be completed quickly - but with Southwark closing off so many routes with LTNs, and the Mayor turning the South Circular into a tariff boundary that isn't possible. And with no authority prepared to put pressure on whoever is doing the work, and for whatever reason (because, perhaps, it's in two 'domains' that don't, or won't, talk to each other) we have the ordinary voters and tax payers paying the consequences.

  • Like 1
52 minutes ago, CPR Dave said:

Is it the Labour Council or the Labour mayor you are calling a halfwit?

The South Circular is a TFL road and I think Croxted Road is governed by Southwark council.

 

The roadworks permit was granted by Lambeth (as it's in their borough), the applicant was TfL. The basic permit says "highways repair and maintenance" scheduled to last until 6th July. 

  • Thanks 1

Here's guidance from TfL on managing streetworks, worth a read.  https://tfl.gov.uk/info-for/urban-planning-and-construction/our-land-and-infrastructure/roadworks-and-street-faults

Regulations introduced recently by government to improve the handling and quality of repairs by utility companies

www.gov.uk/government/news/new-street-works-regime-to-clamp-down-on-pothole-pain

And the road rental scheme (restrictions on those carrying out repairs) introduced by TfL following support from government

https://content.tfl.gov.uk/lane-rental-scheme-document-20210501-final.pdf

 

I thought I'd find something in the government's manifesto but the only thing in 2019 was "Get Brexit Done"

 

  • Haha 1
18 hours ago, Dogkennelhillbilly said:
22 hours ago, Penguin68 said:

but with Southwark closing off so many routes with LTNs, and the Mayor turning the South Circular into a tariff boundary that isn't possible.

See, the problem with this is that you've just made it up.

I have just made up that the South Circular is the tariff boundary for the currently extended ULEZ - really? - and thus that diversions off the South circular through bits of Dulwich wouldn't carry tariff penalties? I have just made up that Southwark's LTNs (which I am sure exist, there's been so much written about them here) stop many diversions off and back onto the South Circular for at least part of the day - are you really suggesting that? These are two actions which make traffic re-routing flexibility at the time of need very difficult or costly (to the motorist). That is a clear downside to the traffic alterations instituted by the Mayor and Southwark independently of each other.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Big recommendation for Stephen Viccary who has created a magnificent bathroom for us. Quality of work is absolutely top notch. We couldn't be happier - see pics.  Stephen is considerate and tidy meaning working from home during the work was fine (some noise - obviously, it is a demo and installation after all. He does not work on multiple jobs, does a full days work and does ALL the work himself - Tiling, plumbing, lighting (including lighting on a motion sensor under the vanity and in the shower niche - for night time visits 😉), he even changed the door architraves, sorted the badly cracked ceiling and did all the paint work. A full end to end service. Stephen's number - 07941 266 145
    • Highly recommend Dulwich Eco Gardening.  When he came to quote Saied said he’d give our garden back so we could decide what we do next.  Under two weeks of hard work from Saied and Mo and we have the garden back and can see paving I’d forgotten about. Not only did Saied remove our very overgrown greenery. Nature had taken over. He also took back to our fence line overgrown ivy, apple and pear trees and and dealt with a neighbours bamboo that had invaded our garden.  We are now going to get quotes for what we do next so those quoting will be able to see the space.  Saied has suggested someone to quote and will be coming back when he does in case he has any questions or they can work together.  I thought Saied would be a good choice and he was. Quotes from others didn’t leave me with confidence for the end result. That was never a concern with Saied.
    • Having a BBQ (fingers crossed) in 2 weeks and need a small BBQ for veggie bits and any spare benches or garden tables and chairs to borrow to add to mine. Any going? Thanks in advance...
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...