Hi All


we are having some work done ( a new back door ) and assumed that building control would be part of this as they are going through our chimney -- we have no doubts about the work and are happy with the builder however he has advised not worrying too much about building control as it could be complicated -- any advice the southwark site seems complex ( unsurprisingly ) I presumed building control would simply come look at the lintel and say -- this is safe/not safe certificate and then off we go with plastering making good ?


we have planning permission and a structural engineer looked at it for us beforehand and said all was fine


-- who can do building control certification ?

-- is it just a site inspection ? or should it have been 'cleared with building control first' ?

other builders quoted '250 for building control'


really need advice tonight if poss....


Thanks

Salim

Call them first thing tomorrow to discuss. It's not worth compromising even if you're happy with the builder, both your safety and nightmare when you come to sell.


Depends, but usually BC come round to inspect and sign off at the end, or regular during the works if complex.


BC fee varies but sounds about right for form filling and doing all the calcs.

Building control do not undertake structural safety checks - they are there to make sure that correct/ specified materials are used - such as fire proofed panels and insulation depths and that the work done matches what is on the plans (for either a planning permission or a permitted development). They are there to check that building regs have been followed. They don't normally comment on the quality of the work done (but if the wrong guage RSJ was used they might notice, if it wasn't already boxed in, although they can require it to be exposed to check). The more they 'kmow' the builder's work (assuming it's been OK in the past), the less they tend to check (it's unknown and new builders who get the most scrutiny - not unreasonably).


As long as the building work has been notified it's up to them what checks they make and when. If it hasn't been notified (this doesn't seem to have been) - and the work doesn't come under either planning permission or permitted development it's up to you - but you could employ your own structural engineer rather than the council's inspector. I am assuming that you are the owner of the property.


If the builder has come with recommendations and is a member of the Master Builders Federation (or similar group) then you should be OK - the work should come with a guarantee.


As far as selling is concerned, it's normally only changes which would require some form of consent (which isn't there) which could cause problems - otherwise buyers will tend to rely on advice fom their own surveyers. The council doesn't issue certificates of good work, just of lawfulness.

Work on a chimney etc does need building control and you should have notified them 48 hours prior to starting work (they in turn notify your neighbours). Your builder may be advising you not to do so because technically you also need to serve a partywall notice for chimney work if it on a party wall (very likely if you are mid terraced). A lot of people won't bother with the partywall notice but if your neighbours have been difficult this might be what's concerning your builder now.


Also, building control absolutely do not verify that you are building a project to permitted development or planning permission specifications. It falls completely outside their remit. A property can be signed off by building control that has no planning permission. Building control do ensure that the plans and building are up to code and review the structural engineer drawings you submit.

You don't need to use the council for building control - independent companies can undertake this work but again need to notify the council prior that

a) the work is taking place

b) they are acting as your building control

In my experience you would only consider this route if the project is particularly complex/multi-phased, uses solutions (fire suppression for example) that the council are not experienced with and therefore are likely to turn down, or you just don't trust them/don't want to hand over any more money to them.

THANK YOU THANK YOU THANK YOU -- The forum is indeed a wonderful place - interestingly after building control was raised they have undone a lot of the work ( pulled out a lintel) and replaced it....


makes you wonder if it was good enough in the first place.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • It’s not great, but this only happens when a business is in trouble and is facing bankruptcy. The landlords are free to say no. The restructuring will often then have to be approved by a High Court judge, so it’s not a total gun-to-the head. It does upset landlords quite a bit though, because if the business does go under, they’ll likely not see any pay out. So they often feel under pressure to comply. 
    • "Sitting around doing job related things". Do you mean sitting and doing their jobs? "have you had your COVID jabs?" Perhaps instead of spending your time on here insulting other posters, in this case me, you would be more effectively employed contacting the practice management with a detailed description of exactly what you say you saw and when. And then see what they say. You have made a lot of assumptions with presumably absolutely no idea what those people's jobs are or when their break times are. I am not defending the practice, which seems to have some problems  I just don't like seeing people who aren't here to defend themselves being publicly attacked by someone who apparently doesn't actually know what those people were doing and why.
    • Relatively recently, they employed a couple of young people on front desk work they were excellent. I don’t know if they’re still there. And yes, they may be doing something on their computers that’s important but when you see  people queuing and no one appearing for many minutes the system seems inefficient.  Some simple changes could make a big difference.  But those changes would have to come from management rather than individual workers choosing to jump up and help. 
    • I'm happy not seeing a GP face to face.  I had WhatsApp video appointments a couple of years ago,which ended up with me being rightly sent to Tommies A and E.  I see nurses from time to time at TJ, I always have a good laugh with both them and the blood test people.  I see the practice nurse at FH from time to time and it feels like visiting an old friend. I'm not sure whether social media has made us a more negative nation, or it just feels this way due to some of you who post on this forum.  The majority of posts in ED matters and on the transport thread are complaints  How would you define lazy and useless?  There is a spectrum of productivity, and of customer service.  Some excel at one or both, but I'm not sure at what point workers drop below an acceptable level.  When I am unhappy I will complain to an organisation. Some respond better than others.  One of my first posts over a decade was to complain about a local shop.  It's a funny anecdote which is essentially a "Ok you don't want my money so I'll go and spend many 100s of pounds at a different company" but I regret not dealing directly with the shop rather than getting pointless revenge many years later.  Still won't use the shop though.        
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...