Jump to content

Recommended Posts

41 minutes ago, KalamityKel said:

Erm actually, they've been doing a fair bit more than that tiny patch.  They're incredibly tidy and fill things back in once done and take the temp lights out often.

Lots of preparation, from my daily observance (no I'm not a nosy neighbour, the walk past that stretch is part of my daily commute), has been done especially with wiring.

One of the crossings, already in place (not in use), does take a bit of looking at to process how it will work with the flow of traffic and timings... 

Considering the heavy use of the junction, I think the work being done is not too bad.  The traffic does move, unlike when the numerous pipes from the library and right through/past Forest Hill burst.

It's worth keeping in mind, the Thames Water Works at the Library are not helping with congestion. The timing of these two projects are really the 

"Considering the heavy use of the junction, I think the work being done is not too bad." - what work? The hole in the ground?

51 minutes ago, KalamityKel said:

Erm actually, they've been doing a fair bit more than that tiny patch.  They're incredibly tidy and fill things back in once done and take the temp lights out often.

Lots of preparation, from my daily observance (no I'm not a nosy neighbour, the walk past that stretch is part of my daily commute), has been done especially with wiring.

One of the crossings, already in place (not in use), does take a bit of looking at to process how it will work with the flow of traffic and timings... 

Considering the heavy use of the junction, I think the...

 

Thanks for the positive, or dare I say constructive (!) post.  Others feel they know better than the professionals.  Surely there are other things to occupy your time?  Whoops, and mine too 😁

  • Haha 1
1 hour ago, KalamityKel said:

Erm actually, they've been doing a fair bit more than that tiny patch.  They're incredibly tidy and fill things back in once done and take the temp lights out often.

Lots of preparation, from my daily observance (no I'm not a nosy neighbour, the walk past that stretch is part of my daily commute), has been done especially with wiring.

One of the crossings, already in place (not in use), does take a bit of looking at to process how it will work with the flow of traffic and timings... 

Considering the heavy use of the junction, I think the work being done is not too bad.  The traffic does move, unlike when the numerous pipes from the library and right through/past Forest Hill burst.

It's worth keeping in mind, the Thames Water Works at the Library are not helping with congestion. The timing of these two projects are really the bug bear.

What work? 

Two weeks in and we have a hole in the ground and that is it. The major A road blocked for 13 weeks because of London mayor and Southwark council incompetence. 

Am not moaning about a budget - what budget anyway? 

I had no letters, emails or any other notifications warning me about the upcoming works, even though I live next door.

No one told me:

1 what the proposed work is about

2 why now

3 what is the cost

4 how were the costs calculated - what company was selected to complete the works and what criteria were used.

Edited by ab29
  • Agree 1

It's a pedestrian crossing,  to make it safer and easier for people crossing that junction on foot.   It was planned well before Covid - there was a public consultation.  I assume the financial challenges and other issues caused by the pandemic delayed it somewhat.

Generally,  improvement works in your local area are a good thing yes?  Even if you have to suffer some temporary disruption. 

Edited by Cyclemonkey

You are a cynic and you are wrong. The scheme has been planned a long time and TfL Streets will have set aside funding as part of a long term plan. The idea that a rush of public sector works take place toward the end of the financial year to use up money that has been found lying around is a myth. 

I have ZERO faith in the "improvements work" in my local area since the ltn was forced on people despite the rejection.  On the contrary. Sorry to all the council staff on this thread.

For years we have been asking for extended time on the crossing on L.L / Wood Vale for pedestrians - no reaction.

For years we have been asking for a proper pedestrian crossing on Collage Rd, in front of Dulwich Park - no reaction.

But suddenly Dulwich Collage / South Circular round-about is blocked, who knows why, with one hole dug out in two weeks, stationary traffic excacerbated by the ltns, air and noise pollution through the roof and ambulances, police cars and fire enginees stuck anc delayed in this mess. Just because the council asnd tfl can 🤔

Edited by ab29
3 minutes ago, ab29 said:

I don't use google.

Other search engines are available.

3 minutes ago, ab29 said:

No evidence the local residents wanted this chaos then 🙂

I assume you want things like gas, water, sewage, electricity, internet, safer roads...? Cos if you do, that's the price of them, occasional disruption when those things are repaired, replaced, upgraded etc. The idea that you'd be consulted on all of them is insane. And even when consultations happen, they're not Yes/No answers, no-one is going to say "do you want a sewer pipe or are you OK with all your waste running down the street like in the Dark Ages?", they're "we are going to do X, have you got any thoughts on it?"

I am not wasting my time indulging sealioning.

I took part in a public consultation, TfL wrote to me with the results  which were overwhelmingly positive.  If you are so keen to find out I suggest you do a little extra work and send in an info request to TfL.

6 minutes ago, exdulwicher said:

Other search engines are available.

I assume you want things like gas, water, sewage, electricity, internet, safer roads...? Cos if you do, that's the price of them, occasional disruption when those things are repaired, replaced, upgraded etc. The idea that you'd be consulted on all of them is insane. And even when consultations happen, they're not Yes/No answers, no-one is going to say "do you want a sewer pipe or are you OK with all your waste running down the street like in the Dark Ages?", they're "we are going to do X, have you got any thoughts on it?"

Yeah, "occasional disruption" - we live in a block of flats on LL.  We have no gas. Electricity only.

 

 

Posted (edited)

As the person who kicked this thread off could I just note the following:-

1. As a resident of the Southern end of Underhill (for the last nearly 40 years) this junction (of the South Circular with Lordship Lane as it runs into being London Road) has always been considered hazardous to pedestrians. There have been numerous attempts to get 'something' done about it, the key issue being, so far as I understand it, that there were no 'simple' solutions which could be easily input. So nobody has argued that something didn't need to be done, but no one actually knew what that something might be. Because of the width of the roads at the key point the necessary time taken to stop traffic (from 3 directions) to allow pedestrians to cross was always considered too long to stop traffic entering and exiting the South Circular. I am very clear that all those pedestrians using the junction were very well aware of its dangers and wanted a solution, whatever that might be.

2. On the assumption that there is now a solution to this, my complaint was that 13 weeks to implement it seemed far too long - if the problem had been solved (which I imagined might involve some pretty canny traffic light timing and sequencing) the work to set it up was actually a programming job for the lights - which might take a lot of time but would be done off site and in advance. On site it would just be a matter of wiring in lights and controller boxes, signage and road marking. With, possibly, new traffic islands, and consequent re-surfacing

3. The fact that the amount of actual construction work done in the first week was minimal, and in the first two weeks hardly more so, does suggest that this is not a well planned (project managed) exercise. It has taken, it would seem, two working weeks, excluding evenings and weekends, to achieve what appears to be two days work. When quite long stretches of Underhill were resurfaced, including reinstating stretches of paving, this was blitzed out in a couple or 3 days, for instance, so I do have an idea of how fast even contractors for Southwark can work. When the plans were first published (only a few of days before the start of works), I felt that 13 weeks, even assuming only weekday daylight working, was far too long. Which it seems, so far, to have been.

4. But this is not work which wasn't wanted, and which has been imposed on an unwilling electorate. Far from it. It is the method and manner of the project, not its intent, which I believe is the act of very poor planners without any regard for local users of these roads.

But then TFL (and the Mayor and his predecessors ) have always hated and despised South London and have no interest in investment in transport - compare the North Circular with the South, compare the availability of Tubes north and south of the River - well, need I go on?

 

Edited by Penguin68
  • Like 1
2 minutes ago, Penguin68 said:

On the assumption....

...it seemed far too long...

I imagined...

...does suggest...

...it would seem...

...what appears to be two days work....

I felt...

...it seems...

...I believe...

So actually, you have no idea of anything, just a list of assumptions and beliefs about how long you think this work should take? Seemingly based upon another belief that all contractors are inherently lazy ne'er-do-wells and a Mayor who apparently "despises" South London (in spite of actually being born in Tooting, being a councillor for Wandsworth and then an MP for Tooting)

You might have shared your expertise in project management, road design, phasing of works, the numerous different organisations involved (and the associated numerous different bits of infrastructure under the roads), risk management...? 

  • Thanks 2

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Of course they do, watching cookery shows and buying cook books is a national pastime. However you raise a good point that some people claim they are time poor and end up eating out / takeaways as sometimes a quick macciedee is cheaper and easier than making a quick nutrious family meal.  However to put it in balance, not many people have the knowledge, confidence and time to cook Persian so good luck to team persepolis on this venture. 
    • London doesn’t have a lot of Argentinian places specialising in empanadas, which suggests demand isn’t that great. There are many neighbourhoods with none at all or even nearby.  So for a mini-chain like Chango (several branches in SW London) to open here where there’s already a well established family run place doing the same feels a bit off.  I’ll be giving Chacarero my ongoing custom. 
    • This is so helpful, everyone, thank you. @green bean Yes we have just (as of yesterday) installed the same external blinds you mention! We already had blackout blinds and we now have the external awnings too. Of course that will guarantee the end of the summer sunshine but I can see that they're going to be helpful as they let the light through but not the glare of the sun - I'm fed up of working in darkness with both the blackout blinds closed on sunny days. We'll see how we go with those for a bit but I reckon we'll get a couple of quotes from the other recommendations in case we end up going the whole hog. @penfold Love the idea of getting solar+batteries to offset the electricity usage so will look into that.  Thanks, all.
    • Yes Sally, I've emailed him several times since Xmas. I don't contact Councillors frequently but when I've done so over the years, I've found them generally engaged and responsive. It's unprecedented to just be ignored and, regardless of the query I'm raising, that's worrying from the point of view of  our local democratic voice. Its a Councillors role to represent local people! A different thread on here made reference to a lack of response from one of our ward councillors and, since there are only two, I'm guessing it's the same one. I'm following up my own concern separately but I'm asking on here about whether others have had the same problem. I'd like to think it's a one-off but, increasingly, I suspect it's not. Hope that gives a bit more context!
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...