14 hours ago, Rockets said:

What work are they doing outside ED station? Another route in and out of Dulwich disrupted...it's becoming a badly organised joke.

No idea, but whatever it was was backing up the traffic right up Lordship Lane.

There were four way (it said) lights before the roadworks, and a whole lane of the road dug up (on the station side).

On 27/03/2025 at 13:06, Earl Aelfheah said:

I'm not sure, but think it might be. Looked like there were pipes going in.

Walked past yesterday, it's not Thames Water, but Conway on behalf of Southwark Council. 

Don't know why they couldn't have done it alongside the night time resurfacing of that stretch a couple of weeks back.

  • Thanks 1
  • Sad 1

Ah so it's part of the Melbourne Grove Streets for People works then. Madness that the council goes ahead with this when there are so many other works disrupting traffic in the area but I suspect year end budget surplus spends are at play here. Who at the council is responsible for the co-ordination of this type of thing?

  • 1 month later...

Overnight works / road surfacing that should have happened last night, and tonight, have apparently been postponed for a month. No letters. No follow ups. Just word of mouth amongst businesses opposite the junction 🫣😶😩 apparently due to TW leak that has sprung up - not that I can see where, but the local rumour mill is rumouring. 

Glad so much progress can now be seen, but it’s gonna take longer to complete than the originally planned: “13 weeks from 3 March” 😶‍🌫️. Does anyone have any confirmed / solid progress updates? 

 

 

  • Thanks 1
  • Sad 1
  • 3 weeks later...

Saw this article in the Guardian about pensioners in Italy who help advise on construction work, and it made me smile with the interest in road works in the area.  Not that this interest is limited to pensioners I add.  https://www.theguardian.com/world/2025/may/24/you-feel-useful-to-society-italy-umarell-busybody-pensioners-go-professional

1 hour ago, jazzer said:

OH FFS, please don't quote from that rag

".....Try talking and getting on with neighbours, it makes life so much easier helping each other out, chatting, talking, laughing, crying and having fun together. "🤔 

I'm confused 😕 

On 07/05/2025 at 19:33, LadyLordship said:

Overnight works / road surfacing that should have happened last night, and tonight, have apparently been postponed for a month. No letters. No follow ups. Just word of mouth amongst businesses opposite the junction 🫣😶😩 apparently due to TW leak that has sprung up - not that I can see where, but the local rumour mill is rumouring. 

Glad so much progress can now be seen, but it’s gonna take longer to complete than the originally planned: “13 weeks from 3 March” 😶‍🌫️. Does anyone have any confirmed / solid progress updates? 

 

 

How can this work be taking longer than 13 weeks? Does Southwark council have too much money and doesn't know how to spend it?

Posted (edited)
5 hours ago, ab29 said:

Does Southwark council have too much money and doesn't know how to spend it?

Actually so long as no work is being done, and mostly it isn't being done, the only cost is to business and the general public is extending the costs of disruption. And it's mainly TFL who are bearing what build costs there are, I believe. And why should anyone in administration of public works care about the cost to the economy of extended public works? No skin off their wallets. Southwark certainly doesn't care about disruption to the general public and businesses, they still get their taxes paid. 

Edited by Penguin68
  • Like 1
  • Agree 1
Posted (edited)
On 31/05/2025 at 12:05, Rockets said:

but there is always a delay for the new traffic signals

These are the things that could have been entirely planned for well before any work started. The wiring, the sequencing, the timing could have been fully designed beforehand. It needs to be tested in situ, certainly, but it should be able to plan the installation for as soon as the infrastructure is in place. It's as if Microsoft built a computer and then decided to design and implement an operating system to work on it. The whole thing about what will be a complex crossing surely would be designed first (when do cars and when do pedestrians move). Which is what the signals are about. 

Edited by Penguin68
  • 3 weeks later...

So the works supposed to end on 8th of June and of course it has not happened. There is now a new hole dug out by power network  - would be boring if it's thames water all the time - next to a church where the turn to College Rd is.

And to add to the misery in the area, Dartmouth Rd will be closed from 30th of June. Till 17th of July. Not thst snyone believes in the end date.

IMG_9436.jpeg

IMG_9427.jpeg

It may be that the power network work is part of the junction build, in which case the appallingly poor planning and allocation of work is even worse than I'd feared, or it may just be coincidental. All that appears to be holding the full opening up of the junction is the new traffic lights to be made operational, which should have been the first thing planned. If these works were being undertaken by a commercial company it would be bust by now. As, probably, are TFL and the council, but they can just go back to the money tree. (Wait for the council's cheerleaders to weigh in now...) 

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Hi Sue, they were not local solicitors. Andrea’s was based in Wales and the other firms involved were large nationwide conveyancing companies (rather than conventional high street solicitors). I’m happy to advise clients and buyers privately on what I believe to be their shortcomings but I don’t think doing so in public on the forum would be appropriate, particularly as they are not locally based. My general advice would always be to steer clear of the big conveyancing companies as they are, in my experience, notoriously difficult to contact when the need arises and the case handler is often not a fully qualified solicitor and so issues have to be referred upwards to “technical teams” internally, which was part of the problem in Andrea’s chain. Tony
    • A slightly vulnerable but hopeful post… Hi everyone, I’m a guy in my mid-thirties who’s recently moved back to London and East Dulwich (I previously lived here for many years before, so I know the area well). But if I’m honest, I’ve found the return a little tough. Most of my close friends have moved out of London to start families — totally understandable — but it’s left me feeling a bit adrift and not quite sure how to make new connections again. Work has taken up a huge chunk of my life in recent years, and I’ve definitely let hobbies, interests and a proper social life fall by the wayside. I feel like I went from a fun social life in my 20’s to suddenly blinking and realising things had gone a bit er…quiet. So, I’m trying to redress the balance a bit — mainly so myself and my partner don’t murder each other 😂, and just to meet some new local faces. I was wondering: is anyone else in a similar boat? And would there be any interest in starting a relaxed, low-key local social group? Could be a casual pub meet, sports, park hangouts, live comedy nights — open to ideas!  I’m happy to do the organising/admin side of things — just wanted to put it out there and see if there’s any appetite. I’ll gauge interest and take it from there.  If you’d prefer not to reply publicly, feel free to drop me a DM.  Cheers all! 👋
    • It's Inner London. You could move somewhere else?