I think the concern is more to do with the sheer number of roadworks that are in the area at the moment. 

Gasworks are essential but anyone trying to get to Camberwell by public transport faces the choice of pavement widening by East Dulwich station or these gas works and road works at Camberwell Church Street.

Top this off with the ones on the south circular plus the ones on crystal palace parade and it does feel like we are slowly getting cut off from going anywhere.

Obviously some coordination isn't happening to get the timings right which is why people are discussing it. 

 

  • Agree 1
  On 06/05/2025 at 15:50, Spartacus said:

Obviously some coordination isn't happening to get the timings right which is why people are discussing it. 

Expand  

There's a limit to how much coordination can be done though. Some of the works will have been planned a long time in advance. Some of them will be reactive and therefore urgent.

And there's a strong argument that a relatively shorter period of higher disruption is better than massively prolonged lower disruption.

  • Agree 1
Posted (edited)

But surely some council bright spark could have worked out that putting temporary lights and contra flow on three of the four arterial routes in and out of an area probably wasn't the smartest decision and would create significant congestion.

Ex- how much of that was likely driven by the need to spend the council road budget surplus around fiscal year end? Is there a date where end of year budget works have to commence?

Edited by Rockets
  • Agree 2
  On 06/05/2025 at 21:19, Rockets said:

Ex- how much of that was likely driven by the need to spend the council road budget surplus around fiscal year end? Is there a date where end of year budget works have to commence?

Expand  

You could honestly make a conspiracy out of anything couldn't you?!

That myth perpetuates because it's difficult doing roadworks over winter when it's cold and wet so once the weather improves a bit, they're out in force fixing winter defects so everyone goes "ooh they're using up the last of the budget..." 🙄

It's total nonsense. 

  • Haha 1
  • Agree 3

The issue is not the gas works per se, it is about this happening simultaneously with all the other large scale works. If these large scale gas works have literally only come to light at the last minute, then fair enough. However, if there was some forewarning then perhaps the pavement widening, non-urgent, but politically expedient, stuff could have waited.
 

Anyone know for sure how long these gas works have been in the offing?

  • Agree 1
Posted (edited)

These works are planned maintenance, not emergency work so coordination had to be made in advance with TfL and hopefully Southwark council which is why someone in either organisation should have said "hang on lads, this is bad timing" 

But who am I to spot the bleeding obvious ? 

Edited by Spartacus
  • Agree 2

These works were in place this morning.

Northbound traffic backed up from the Nigel Road/Nags Head Junction all the way back to East Dulwich Road at 7.30am

I was on a bike, but this will cause misery for the many many people who travel to Peckham Rye station by bus .

As always with these works, the phasing of the lights was totally out of sync with the demands of the traffic, with the traffic back up a long way, so i hope the workers will adjust this.

Appreciate essential work needs to occur, but agree with the original poster that there never seems to be any urgency to complete the works quickly.

  • Agree 2
Posted (edited)
  On 07/05/2025 at 09:38, exdulwicher said:

That myth perpetuates because it's difficult doing roadworks over winter when it's cold and wet so once the weather improves a bit, they're out in force fixing winter defects so everyone goes "ooh they're using up the last of the budget..." 🙄

It's total nonsense. 

Expand  

But they need to do all of them at the same time around the close of the financial year cos MArch and April are always such dry months 😉 - what's the catalyst for that then? 

So are you confirming then that if there is a surplus is can be spent any time after the close of the financial year for the council?

Edited by Rockets
  On 07/05/2025 at 16:00, Rockets said:

So are you confirming then that if there is a surplus is can be spent any time after the close of the financial year for the council?

Expand  

I said nothing of the sort Rockets, stop trying to put words in my mouth.

You could of course just ask Southwark Council - in fact their finances must be available on their website, why don't you go and have a look through that seeing as you're always saying how you "do your own research" and how much you love council data.

Also the gas works will be paid for by the utilities company, not the council.

  • Thanks 1
  On 07/05/2025 at 11:21, Johnjohn said:

These works were in place this morning.

Northbound traffic backed up from the Nigel Road/Nags Head Junction all the way back to East Dulwich Road at 7.30am

I was on a bike, but this will cause misery for the many many people who travel to Peckham Rye station by bus .

As always with these works, the phasing of the lights was totally out of sync with the demands of the traffic, with the traffic back up a long way, so i hope the workers will adjust this.

Appreciate essential work needs to occur, but agree with the original poster that there never seems to be any urgency to complete the works quickly.

Expand  

Thank you for the traffic update.  Very important info I will pass on to someone travelling that way to an exam tomorrow. 

Ex- I am challenging you as you are suggesting it is a myth that the council ramps works at the end of the financial year to spend any surplus and you claim it is actually because of the weather....but I am still trying to determine why so many non-essential works (like the DV, Melbourne Grove and A205 works) all seem to have started around the same time in March - hardly the most predictable time in terms of weather. 

I was not putting words into your mouth but posing a question...

 

  On 07/05/2025 at 21:16, Rockets said:

but I am still trying to determine why so many non-essential works (like the DV, Melbourne Grove and A205 works) all seem to have started around the same time in March

Expand  

Please define "non-essential".

Why are they not needed (according to Rockets) but needed according to TfL / Southwark? 

The A205 works have been on the cards for years. Prevented by Covid initially, then by TfL's financial situation post-Covid, then by some unforeseen landowner / access issues. So these apparently non-essential works have been planned for years, it's not something that Southwark / TfL have gone "we're bored and have a million quid to spend, what can we dig up today?"

You cannot go around claiming that something is non-essential. You don't know that at all. Neither do I to be fair although at least I'm not going round claiming it. 

And regarding the phasing of works, I assume you're thoroughly up to date on the council's pipeline of schemes, prioritisation principles, workforce availability (and the tender / procurement process and timelines), supply chain limitations, related nearby works (both highways and other general building works), scheduled community events (probably not relevant to the pavement outside ED station but very much a concern if you're going to do work outside somewhere like Dulwich or Brockwell Park...), funding availability...

By all means ask the council though. Do post their reply up here.

 

Ex- come on, you know what essential works are - if a water main bursts or the gas/electricity supply is cut - you need to get in there and fix it immediately to reconnect supply/repair the damage.

Three lots of changes to the pavement layout are not "essential" and should never have been scheduled to happen at the same time cutting 3 of 4 arterial routes into and out of Dulwich. Surely you be pragmatic enough to agree with that?

The timing of having all 3 at once was a disaster and responsibility for that lies with the council and I still believe two of them happened as the council needed to spend surplus as the end of the year.

 

  • Agree 2

I would hope that the council is concentrating on necessary works only (of course we know, vide what's going on in Central Dulwich that's not true), but some are more time critical than others. Things which are broken and dangerous need fixing first, then things which would benefit from improvement rather than repair. These can and should be scheduled to be of as limited a disruption as possible, and particularly scheduled in the light of other works 'on the books'. There is no evidence whatsoever of such joined-up thinking in the planning department, or any liaison between boroughs on work which adjoins other boroughs. 

  • Agree 2
  • 4 weeks later...

Slowly, junction by junction, East Dulwich is cut off from the outside world and in a matter of weeks becomes the first experimental 10 minute village.

In order to stop the masses starving after M&S and the co-op run out of food, the red cross start using air ambulance to drop food parcels in. 

Despite mass protests, Southwark deemed the experiment a success and replicate it across the borough.

Who needs a CPZ or LTN if there is actually no where to go cry the cycling lobby who use the pavements to.get around the road works and bypass the temporary traffic lights all stuck on red.

Welcome to carmagedon 

  • Haha 5

It sounds like we live on different planets,  I just go with the flow, generally, and when unhappy take it up with the relevant authority.  I have found this frustrating at times but life is too short to be angry all the time.

I visited Carmagedon when volunteering at Glastonbury a few years ago.

image.thumb.jpeg.f1dcb73881d93bc54e026d0fd3eb6ce3.jpeg

Not the best photo, scrap cars that they have done wonderful; things with, but it's a bit out of the way so 98% don't visit.  Just found out it's forerunner was the wonderful Mutoid Waster Company, older hippies may understand what I am on about (When Glastonbury was great)

https://www.glastonburyfestivals.co.uk/news/carhenge-returns-for-glastonbury-2025/

Its total gridlock around the festival nowadays, hence most years I cycled when I was a regular.

 

 

 

  On 31/05/2025 at 12:04, tedfudge said:

There's now 4 way traffic lights at the junction of east dulwich road and crystal Palace road adding to the misery of roadworks and temporary lights

Expand  

Traffic along the Ed side of Peckham Rye was crazy yesterday afternoon too. Not great.

  • Agree 1
  On 05/05/2025 at 09:53, Penguin68 said:

I don't think the issue is about whether the work is necessary or beneficial (in the - very - long run) but rather any expectation that it will either be scheduled, or indeed delivered to the benefit of those living locally and using local roads; my experience has been that these sort of works are scheduled and delivered to the benefit solely of those undertaking the works, without any consideration of the disruption to those of us who live here. These are our roads, which we have paid for, and their use is being taken away from us by a private company set only for its own profitability, without regard to our loss of utility value. Had I any belief that the scheduling was planned around minimum disruption to road users I would be more relaxed, and indeed if I see significant work going on every day on site I will be slightly re-assured - but I'm not holding my breath. And I don't expect the council we have elected to give a damn!

Expand  

Well said. All the roadworks up and down East Dulwich could have been far better planned in, so as to avoid 3-4 sets of roadworks happening at once around ED station, on Lordship Lane towards Forest Hill and on Peckham Rye. This means there isn't one route you can get a bus to a train station at anything other than snail pace. I've written to our MP Ellie Reeves as it seems never ending... yes we agree they're vital works but there is minimal communication with residents and having closed roads to create LTNs the buses many of us rely on (especially if our morning and evening involves a nursery or school run) are impossibly slow. Infuriating and so stressful as it affects work too for those who have to go into the office regularly. Cycling and walking not always options.

  • Like 1
  • Agree 3
  On 31/05/2025 at 19:00, EDmummy101 said:

Well said. All the roadworks up and down East Dulwich could have been far better planned in, so as to avoid 3-4 sets of roadworks happening at once around ED station, on Lordship Lane towards Forest Hill and on Peckham Rye. This means there isn't one route you can get a bus to a train station at anything other than snail pace. I've written to our MP Ellie Reeves as it seems never ending... yes we agree they're vital works but there is minimal communication with residents and having closed roads to create LTNs the buses many of us rely on (especially if our morning and evening involves a nursery or school run) are impossibly slow. Infuriating and so stressful as it affects work too for those who have to go into the office regularly. Cycling and walking not always options.

Expand  

Good luck on that.  I expect you will get an "oh dear, sorry you live in London and there are road works fairly frequently".

I am in correspondence with her about the Government's position on Palestine.  I've decided not to raise her sister's handling of the economy. She wasn't great about improvements to the train service but very good reports on personal welfare type stuff.

Out of interest what do you expect our MP to do?  Privatise the utilities, with an injection of cash to upgrade them, and a massive local road improvement programme?  Good luck on getting that through the Chancellor.  Although I expect Farage has promised at least some of this.

  On 01/06/2025 at 10:02, malumbu said:

Out of interest what do you expect our MP to do? 

Expand  

Represent her constituents concerns to the relevant authorities or companies. It's what MPs do to assist their constituents and it's why they hold surgeries.  Most of what MPs do locally is nothing to do with new legislation (or indeed foreign policy issues), but about sorting local problems or more accurately reminding 'people' that MPs are watching over their shoulders. 

  • Like 1
  • Agree 3

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Check out Family Feasts https://www.familyfeastslondon.com I’m sure Dani can help  
    • Goodrich Primary School has spaces available for September 2025 Nursery.  To find out more about Goodrich, please visit our website, where you can also book a school tour! Nursery Places Available.pdf
    • Yawn.. as I and others suspected the noticeboard is already looking shabby, has the details of local councillors who in my experience are of very limited help with anything at all (e.g. noticeboard took several years of writing to get back in working order and now isn't being kept up to date with any useful local info about food banks or any services as promised). So nothing at all in left hand side. Pointless and a real shame as could benefit so many small businesses.. and no I don't own a small business I just believe in supporting shopping locally where possible and know they often have little to no marketing budget.
    • so here we are in 2025 many years after the referendum where import/exports costs are indeed much higher and (checks notes) arch Brexiteer is now lobbying for a European Commonwealth including Turkey   Mad baby of a country   https://www.aa.com.tr/en/europe/uk-wants-to-include-ukraine-in-european-commonwealth-report/2599081