Millions of pounds have been spent on design, redesign and re-redesign etc. of closed Dulwich Village junction - and yet the bridge in Dulwich Park has been closed for over a year now.

Whatever the initial ptoblem was it has been made ten times worst by doing nothing.

Why there is enough money  to waste on vanity projects like the DV junction and LTN and yet not enough to do something for the community??

IMG_9280.jpeg

Edited by ab29
  • Agree 1
  • ab29 changed the title to Dulwich Park bridge closed for over a year - why?
Posted (edited)
18 minutes ago, LurkyMcLurker said:

Have you tried asking anyone who might be able to provide an answer to your questions that have first hand knowledge of the issue with the bridge in the park?

Yeah, contacted MP Helen Hayes and Andy Simmonds the councillor. 

Not helpful lurkey southwark council employee

IMG_8854.jpeg

Edited by ab29

Claresy posted this back in March response from Southwark Park Service:

"Thank you for contacting the Park Service about the boardwalk over Dulwich Park lake.

Whilst remaining closed, the bridge has been thoroughly inspected and assessed for repair or rebuild options and as a result of this assessment it has been found to be uneconomical to repair and for health and safety it will need to be dismantled and removed. A replacement boardwalk has not been decided but is being investigated. Once we have new information it will be shared with the community of park users like yourself and local councillors but the bridge will remain closed.

I hope this helps,"

 

Posted (edited)
11 minutes ago, Kathleen Olander said:

Claresy posted this back in March response from Southwark Park Service:

"Thank you for contacting the Park Service about the boardwalk over Dulwich Park lake.

Whilst remaining closed, the bridge has been thoroughly inspected and assessed for repair or rebuild options and as a result of this assessment it has been found to be uneconomical to repair and for health and safety it will need to be dismantled and removed. A replacement boardwalk has not been decided but is being investigated. Once we have new information it will be shared with the community of park users like yourself and local councillors but the bridge will remain closed.

I hope this helps,"

 

Thank you Kathleen for posting it - there are no words

Edited by ab29
On 22/06/2025 at 19:28, Kathleen Olander said:

Claresy posted this back in March response from Southwark Park Service:

"Thank you for contacting the Park Service about the boardwalk over Dulwich Park lake.

Whilst remaining closed, the bridge has been thoroughly inspected and assessed for repair or rebuild options and as a result of this assessment it has been found to be uneconomical to repair and for health and safety it will need to be dismantled and removed. A replacement boardwalk has not been decided but is being investigated. Once we have new information it will be shared with the community of park users like yourself and local councillors but the bridge will remain closed.

I hope this helps,"

 

As I just posted on another thread, surely the bridge cannot have been fit for purpose in the first place if it has to be replaced so soon.

Either the contractors or whoever in the council approved the spec must be responsible for this, and if the contractors, surely they should rebuild it?

I would be interested to know exactly what is making the bridge unsafe.

If it is the materials used, similar bridges over water in the Wilderness Island nature reserve in Carshalton have been (re?) built using a strong man made material which looks virtually identical to wood but is not slippery when wet, and does not rot.

Surely this must have been available when the Dulwich Park bridge was built.

I don't know the financial implications, but hopefully Southwark Council did not put cheapness before safety.

10 hours ago, Sue said:

As I just posted on another thread, surely the bridge cannot have been fit for purpose in the first place if it has to be replaced so soon.

Either the contractors or whoever in the council approved the spec must be responsible for this, and if the contractors, surely they should rebuild it?

I would be interested to know exactly what is making the bridge unsafe.

If it is the materials used, similar bridges over water in the Wilderness Island nature reserve in Carshalton have been (re?) built using a strong man made material which looks virtually identical to wood but is not slippery when wet, and does not rot.

Surely this must have been available when the Dulwich Park bridge was built.

I don't know the financial implications, but hopefully Southwark Council did not put cheapness before safety.

And yet the Dulwich Village junction is being endlessly re/designed with no end to money or efforts.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You are correct. I do run a solo cleaning company that offers resets and decluttering I've advertised here on ED forum In regards to your feminism comment, nowhere have I mentioned the gender of the reader. Men and women run homes so I'm sorry you were triggered unintentionally.  This post however is about me and in parallel refining my service. I also run my own home with 2 children and alot of the things I've learned as a solo cleaner I apply at home. Every tip trick, product and equipment gets invested back into my own life. I firmly believe in practice what you preach and I aim to ensure my advice and services are personal and lived. It means my clients get holistic support.  This isn't an advert it's me trying to learn more ways to help myself and therefore others.  Thanks for sharing your way of doing it – I like how practical your steps are, especially the rubbish and dishes by type, that makes a lot of sense.   I get where you’re coming from with the 10% everywhere approach. For me, I find doing one room at a time feels less overwhelming because I get that little boost of seeing a space fully finished. I guess it really comes down to what feels easiest and keeps you going – different methods click for different people.
    • Would anyone have any spare real slate roofing tiles? I need a few for a garden project. Happy to pay. thank you. 
    • A plumber needs this to do a few hours work so he can access the outside - has anyone hired one before ? 