Dear all


I post here in an act of desperation and as a warning to all those contemplating a loft conversion. In April 2013, I decided to do a loft conversion to my two bed, typical ED terrace. I received quotes from Classic, Dulwich and Outlook Lofts. Dulwich Lofts weren't the cheapest but I fell for the rugged, workman like nature of Pat Egan (the owner of Dulwich Lofts) and the lilt of his architect (Pamela Fitzsimmons). In June of 2013 I paid the deposit. Work commenced (via subcontractors, which I hadn't been told about) in October 2013.


In December 2013, I had a massive amount of water ingress through one of the two party walls. Pat Egan insisted that it was due to a problem with my neighbour's property. This is owned by Grainger plc; an independent survey has since been conducted by Banbridge Surveyors (I can't recommend them enough) and the report makes for eye-watering reading. It indicates that the roof is wholly sub-standard; the walls which were built to create the new space have significant cracks and have actually crossed into the territory that legally belongs to my neighbour. Interestingly, the surveyor was surprised that it had received approval from Building Control; the "trick" here is that Pat Egan used 'Approved Building Control' [a company called ACT Building Control - based in Gloucestershire] as opposed to Southwark Council under the guise that it would be quicker (PM me if you want more details). Since then we have had Russell from PJP roofing around to ask have a look at it; in his opinion it was the worst 'new' roof he had ever seen; the surveyor said he feared for his life when he stood on it.


For the last few months water has started to enter via the second party wall. I have called, emailed and written to Pat Egan (and all those associated with Dulwich Lofts) on numerous occasions and sent him copies of the surveyors report. Other than send an email to say that he planned to appoint his own surveyor (no timescale specified), he has not responded. 13 months after this entire saga began and having paid 95% of the entire contract value to Pat Egan, my home is still a building site - he has ruined the arrival of my first born and caused untold damage to my marriage.


To top it all off, I recently bumped into his son, Damien Egan. He would happily come round to collect the payments - when questioned about the lack of response, he reported that he was 'no longer working for Dulwich Lofts'.


I had thought I was the only person in this situation, but I see that the poster EDAus has had similar problems ? if anyone knows of a good lawyer, please PM me ?


But above all else, avoid this company like the plague ?

Link to comment
https://www.eastdulwichforum.co.uk/topic/46754-dulwich-lofts/
Share on other sites

Can you take legal action?

They duped you with a spurious building control story. They should be responsible enough to inform you and the legitimate local BC. look up advice on this...I'm sure you have already. Also google se london building and construction solicitors, talk to a few before you commit yourself. I am sure you will get useful info before you commit to spending money. Otherwise pop down to your local legal advice centre. They don't do much but could give you pointers.


Good luck


N

  • 6 months later...

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • Surely you are still covered under these circumstances even if you don't have the physical licence? I can't believe you would be prevented from driving? That would be a ridiculous system. I don't recall any delays   when mine was renewed. Why would their medical department be involved if you have no medical issues? Could someone have made some admin mistake somewhere along the line?
    • Does anyone have the same problem.  I am 79 and have sent my licence renewal form to the DVLA on the 21st October 20 which they have received. I have just received a letter from them them dated 22 December 2025 today saying my licence is with their Drivers Medal Department and will be processed as soon as possible. This follows my telephone call to them after three weeks  from the October date as I had not received my licence back as per their time frame. I also followed this up mid December after finally getting through but did not get any confirmation as to what the situation was. Is this normal practice? On the 7 January 2026 I will be unable to drive as my licence has not been sent back. I have no medical issues and meet all the requirements with no problem as per previous renewals in fact nothing has changed health wise.Their the letter states if they need any more details from me, they will contact me directly. Why has it taken 2 and a half months get get this far? Is this some sort of ploy to get older drivers to finally give up their driving by making life difficult as possible.  Has anyone else experienced this. Read Medical not Medal.
    • You're being a little disingenuous here. It is simply not true that "the area should remain suburban 2/3 storeys maximum" because: -> the area the development is in isn't 2/3 storeys maximum today - as evidenced by the school on the lot adjoining the development to the south, as well as the similarly-sized buildings to the north and east.  -> the SPG doesn't preclude this type of development anyway. This "genie in a bottle" stuff is desperate barrel-scraping. Now you're raising the spectre of a 9 storey building on the Gibbs & Dandy site (the chance would be a fine thing) but also arguing Southwark is too slow to approve things and opposed to development more than 2-3 storeys!
    • The sites in question though are not comparable to the builders yard by the station and less likely to be granted planning permission for 9 storey buildings. The builders yard fronts on to the railway line on one side and virtually no residential property surrounding on the other sides. The Gibbs & Dandy /Kwikfit and ED trading trading estate are surrounded at close proximity by residential, and in the case of the latter a Grade II building, so there would more stringent height restrictions. Both these sites are tired and sad looking, and in need of development to provide much needed housing.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...