Would any kind soul know the very approximate cost of a ground floor rear extension some 6m. wide and 5m. deep, so 30 sq. meters of simple block construction rendered, flat roof, half width window to normal height, simple electric connections and no drainage problems?? Admittedly very early days without proper plans etc. as yet, we have two rough quotes of what I think are ridiculous figures. Thank you.
Link to comment
https://www.eastdulwichforum.co.uk/topic/47601-rear-extension/
Share on other sites

Your relationship with your neighbours?


apbremer Wrote:

-------------------------------------------------------

> Would any kind soul know the very approximate cost

> of a ground floor rear extension some 6m. wide and

> 5m. deep, so 30 sq. meters of simple block

> construction rendered, flat roof, half width

> window to normal height, simple electric

> connections and no drainage problems?? Admittedly

> very early days without proper plans etc. as yet,

> we have two rough quotes of what I think are

> ridiculous figures. Thank you.

It?s expensive. A good rule of thumb is 1,500 psm so for an extension this size the pure construction costs would be 45k excluding VAT. Other things that are probably included in your quote:

1. Fees: architect fees for planning drawings, measurement surveys, engineer drawings, building control plans and fees etc will be between 5k and 10k (depending if you use a fully qualified architect or if you get the builder to use his in house design team).

2. New windows and doors: if you want velux windows, and basic bifold doors add around another 4-5k for that

3. The quote might also include some of the new electrical fittings (LV spot lights, facings for electrical sockets and switches, etc). Depending on what they are assuming, add another 2k

4. Do you need to move your boiler? Did you say you want to install a loo under the stairs? And 1k for moving the boiler (more if you need to replace it) and 2k for the under stairs loo

Other costs not included in a typical quote for a builder but should be part of you budget is;

1. Cost of new flooring throughout (not just the new space but integrating it with the old). The installation costs should be in the quote but not supplying the floor. Without know the final size of your rear room post extension its hard to guess what this will be but assume a minimum of 30 psm

2. Do you want underfloor heating? For an extension that size, that will be an addition 2k at least for a water-fed system and will be on top of the basic spec that 1,500psm mentioned above

3. The cost of any fancy lights you want (under cabinet lighting, over counter lighting etc)

4. The cost of a new kitchen (assuming you are getting a new kitchen).


Total budget for all the extras, 20k would be pretty middle of the road spec.

So I?d budget a minimum all in of 85k for something that large. That?s assuming no new manhole needs to be done with Thameswater, and no garden work (your garden will be ruined post-extension).

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Hi there,  I wanted to give a big shout out to Kushy Move. An idependent letting agent on Bellendon Road. My family have used Kushy's services for more than 20years. He knows the market in this area very well. He has always found us incredible tenants promptly, and has got a fair price. He looks after our tenants and our properties well. He has always given very good advice when assessing our properites.  With so many letting and sales agents in the area (and I have dealt with a lot!), I have always found Kushy to be straight forward and no nonsense.  Highly recommended!
    • From tomorrow, 21st May at midday, Lord Biggar CBE, Regius Professor Emeritus of Moral & Pastoral Theology at Oxford University, talks with Chris Haydon and a small invited audience on PECKHAM PODCAST. This is the Professor who set out to draw up a balanced view of Empire and history but walked into a storm. "OMG, this is serious shit", said one Cambridge academic on hearing of Biggar's plan. Meet the man himself, unless of course you think this Regius Professor Emeritus should be cancelled still.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...