Jump to content

Recommended Posts

Great points being made - please make them on the consultations!


Thanks to those who posted the E and C and CS5 ones too, I don't know why it all can't be done more holistically and communicated more clearly that all this is going at the same time, but there we go.



On the negatives, I too am queasy about bi-directional. And there are too many narrow segregated lanes in London at the mo. These are generally wider, but are they wide enough?


However, my fear is that if I go in with the mentality of all that's wrong with these and nitpick away then TfL will be left with:


- car lobby firmly anti (RAC Foundation already moaning)

- 'business' groups likewise (London First likewise)

- cyclists lukewarm at best, or even anti.


At the first glance I've given them I think these are good enough, and they are at last a step-change. LCN wasn't a step-change. Nor was LCN+. Nor was Cycle Hire. Nor were the first blue paint generation of 'super'highways.



On James' points, I fear he's swung himself into the negative unjustly. Sure, there are problems here - and phasing to green sounds lovely.


But I use that Wellington/W Bridge twice a day, and I have done every day bar holidays for 5 and a half years. yes, the phasing is a little annoying. But it does stop cyclists careering southbound across the junction and over the next, in a highly touristed-area with people not looking the right way etc. Nonetheless, it's annoying, tempts cyclists to jump the reds they get to after the greens and so on and on and on. But do I like the fact that there is a cycle route there for me to use? YOU BET I DO.


Baby. Bathwater. That's where I am at the mo on this.

Hi jrpfinch,

Not that I'm aware - I'll ask Caroline Pidgeon GLA Assembly Member if TfL stufy this holistically across London. As TfL vet around ?3M of borough spend by each borough annually they must have a view if boroughs have incldued sufficient cycle parking provision.

James Barber Wrote:

-------------------------------------------------------

With all due respect to

> ruffers the expecation would be much higher cycle

> flows coming from further away on average (Utrecht

> is a much smaller less populated town). So many of

> the cyclists would expect to cycle further and

> faster (proven maximum time people are willing to

> commute) and be less likely to dawdle on such

> facilities.

>


All I can say is there are a hell of lot lof cyclists using these lanes in Utrecht at 8.30 in the morning going at reasonable speeds. I think the underlying meaning of the last sentence is it could work if cyclists choose to make it work. Dawdle is quite a loaded word - "go at a considered pace bearing in mind the greater good" might be an alternative?

And this is also where the devil resideth in the detail - a too narrow/conflicted segregated path is very different to a wide enough one for cyclists of different speeds to get along (by the faster ones being able to overtake the slower ones).

Thanks James Barber.


How will they know where to put additional bike parking if there is no facility for people to report full bike racks?


How much do you think it would cost to create a website where you can upload a photo of a full bike rack with a time and some GPS coordinates?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I have available a Vivotek IB9367 bullet camera for $45 . This is a network cctv camera that can record to an SD card or a network device. it can be powered by POE (Power Over ethernet) or via an adaptor. It can be set to record when it detects motion I have it listed on Epay at a higher price but i I sell locally there will be no Ppay fees and no postage charges Technical Specifications Model IB9367-HT:  The IB9367-HT is the  professional outdoor IR bullet network camera from VIVOTEK, equipped with a full HD sensor capable of 1920x1080 resolution at 30 fps. With the most updated VIVOTEK SNV and WDR Pro technology, the IB9367-HT is capable of capturing the highest quality images in both low light and high contrast environments. The IB9367-HT also offers great image in night time surveillance technology. By adopting Smart IR II technology from VIVOTEK speed domes, the IB9367-HT IR illuminators now align with the remote focus lens' focus angle to provide the best IR image quality at any lens setting. This feature optimizes IR intensity, reduces IR hotspots, and increases the IR effective range up to 30 meters. Additionally, the IB9367-HT employs VIVOTEK's Smart Stream III technology and H.265 compression codec, reducing bandwidth more than 90%* while still maintaining excellent image quality compared to traditional H.264 without smart streaming. Furthermore, the VIVOTEK VADP (VIVOTEK Application Development Platform) allows users to add customized programs for various applications and user scenarios. Protecting all these features is the IB9367's IP66, IP67 and IK10 rated housing, capable of operating from -30°C to 50°C.    
    • Now if there a council web page, for the tree officer to post occasional news and explanation about work being done, ...  
    • Children sticking their tongue out at adults is age old silly  behaviour. 
    • Am I right in thinking, after a little checking, that 'sim free phone' is now just the equivalent of 'unlocked', ie not locked to a specific network? Sue, if you do find a network that will let you keep a connection with them for nowt, or without any risk (in some cases) of having the number and even account balance withdrawn, do let me know. :)  It's happened to me twice -- once with a really nice number too.  I need to find a better deal for myself too. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...