Jump to content

Recommended Posts

We want to build a 4m2 extension, add an ensuite, get a new bathroom and a rewire. It is a detached house so there are no party wall issues and the extension will be under permitted development. We have drawn plans ourselves showing in detail the floorplan we want. I am really confused about the order which we should do things next:

- do we need architects plans (even though we know the design we want) before builders start work, in order for the work to be signed off as permitted development?

- do architects do building control plans as well? Are these separate plans from the plans used by the builders? Do we need these before the builder starts work?

- presumably we need to know how many RSJs we need, whether we need to move plumbing etc, before we speak to builders to get quotes. If so, how do we find this out? If we need a structural engineer to do this, do we employ the structural engineer direct?

- will builders quote for a job bit by bit ie. this much for new bathroom, this much for extension, this much to fit kitchen, or is it usually a broad quote for the whole job?

- does the architect assist with the contract with the builder or are you 'on your own'?

Sorry for the long and boring post! any assistance really appreciated.

Hi..

Exciting times!!

Just some quick answers -

1 - No - you can apply to your local council for a certificate of lawfulness for your permitted development - you will need to submit a to scale location plan and scale plans and elevations of the existing and proposed layout and fill in a form and pay a fee - if you check on your local council website within the planning section all the relevant details should be there - You don't need an architect if your own plans are clear and to scale.

2 - Yes architects can do building control drawings - you will need to submit these for BC approval from your local council - or you can use an approved inspector - same price I think. These plans would be used by the builders in order to comply with and by signed off by the building inspector.

3 - You can employ a structural engineer directly - or if you go down the route of employing an architect they could possibly recommend. You will need structural calcs for building control.

4 - The best thing to do (if doing it yourself) would be to do a basic specification of all the works that you want done in as much detail as possible and get builders to put prices against the various items - so you can compare them and you are getting a realistic price for what you want (especially in terms of finishes). If you employed an architect to run the actual build and tender the job they would do this.

5 - They can do yes and if you're not confident with doing it yourself it's a good idea - but will obviously add to the fee you pay the architect.

Hope that helps....basically you can employ an architect to do as much or as little as you need. There are also other architectural technologists/designers that can do basic drawings for you - and building firms who might come with their own designers who can help....it all depends what you want! I'm an architect so clearly I would say you should get a better product for a better price (ultimately) with less hassle if you use a registered architect...but there are other options!

  • 2 months later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Why is the name a big of a red flag? Blighty is a common name for the UK whatever people might think.
    • The only election which counts is the General Election.  There is still strong resentment for fourteen year's of Conservative rule. They squeezed the working class's way to hard, then they squeezed the middle class, but somehow the upper class never got touched, funny that.   There is also new resentment for Labour because of the utter balls up they've made of things since coming to power nine months ago. The majority of the population (or at least those with an ounce of common sense) want these clowns out of office ASAP because they see the damage they are doing to UK plc. They squeezed the pensioners, then the farmers and then business. They made and broke promise after promise, or just didn't tell the truth or say what they where going to do, otherwise known as merely lying to get elected. Inflation may be falling but the cost of things in the shops and utility bills keep on rising, the direct opposite of what they promised. They will never be trusted once they are ousted from power in about four and a half years time.   Everything they do and touch causes further harm, led by three stooges, Rayner, Reeves and balls'less Starmer, who couldn't fight his way out of a paper bag. He still thinks he's a solicitor at the DPP. Rather than spending week upon week getting involved in international politics he needs to be sorting out the UK's issues, sadly he's not up to the job and nor are his Cabinet.  Society needs a mix of people with different skills to prosper, not more and more graduates who can't get jobs in what they studied in.   Reform is the current anti establishment party, which will hopefully wither away back to where it came from.  The Liberals and Greens, well what can you say apart from using them as another alternative vote of dissatisfaction, but neither will come to power.  The country seriously needs stability and a Government that stands up for and represents it's people, not what MP's want but what the constituencies want and need.  Government needs to become far more open and transparent, it needs to be seen to be doing its job, doing what MP's are elected to do,  working for the people in the constituencies, getting back to basic principles and rebuilding the trust which has been lost by successive party's immaterial of them being, red, blue, light blue, yellow, green or some other colour.     
    • That’s very insulting! You are basically calling 17 million people that voted to leave the EU ‘thick’.        Brexit happened Sue.  Boring graphs!  Calling Nigel Farage a plastic patriot is also very insulting seeing as he and the Reform Party have had a landslide victory all over England.
    • These charity collectors are often classed as chuggers.  It can be scandalous that the charity/admin may keep a huge percentage of your donations and a tiny percentage is  actually given to the charity.   I can not speak for individual collectors - but it common practice.  
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...