Jump to content

Recommended Posts

Eugh Pickle, you're the 2nd post on here tonight with the dreaded pox...there's a lot of it about.


Lots of CBeebies I think, mixed in with some cake making, model making etc. Also, my eldest has had it, so I was always OK for a playdate anyway when friends little ones came down with it. However, DD2 has not yet had it, I'm praying she doesn't do what DD1 did, which was catch it 5 days before we were due to fly with her for the first time....we go away in early August...eek, may go into isolation between now and then! It was such a total pain.


If over 12 months old you can give them liquid Piriton, it helps a lot with the itching...I know I keep posting about it, but it really saved our life when O had it.


Molly

Molly, definitely a wise idea to stay in isolation between now and your trip, children have an uncanny knack of coming down with things at the worst times! And thanks for the Piriton tip, I have Zirtec for my son's hayfever (can be used in over 2's) so have dosed him up on that this morning and it does seem to have helped his itching. Poor wee man is coming out with more spots by the hour, we now have a lovely collection on his face. He's currently playing some kind of wrestling game with his little sister, so fingers crossed she comes down with it quickly so we get it over and done with.

The long gestation period is a complete pain isn't it. Hopefully he has sneezed all over her and shared the germs nicely, def. better if they both get it and then it is over and done with. I'm still feeding baby C a lot so fingers crossed she has some immunity, and if she does get it, it will be a mild dose.


Hope you don't go too stir crazy entertaining them until they get the all clear.


Molly

  • 3 weeks later...

Sorry,been out of this thread for a little while now. So have any play dates been def set up. We will be free most days of the summer holidays. Once again mine are 7(girl),nearly 5(boy) and 6 months (boy).


Can meet up before the holidays but will only have 6 month old


Loopy

loopylou22 Wrote:

-------------------------------------------------------

> Sorry,been out of this thread for a little while

> now. So have any play dates been def set up. We

> will be free most days of the summer holidays.

> Once again mine are 7(girl),nearly 5(boy) and 6

> months (boy).

>

> Can meet up before the holidays but will only have

> 6 month old

>

> Loopy


I think we are going for Wednesdays P Rye picnic area..

citizenED Wrote:

-------------------------------------------------------

> Just checking to see if anyone will be in Peckham

> Rye Park around 1.30 tomorrow. I'll be there with

> my 21 month old boy. Outside Cafe or in Pic-nic

> area?



I won't be free until Weds 29th July, onwards, as school only breaks up next Weds.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...