Jump to content

Recommended Posts

Does anyone know why the rather nice post-modern flats finished well over a year ago are still empty?

Walked past today and some scrote has grafiti-ed the front. Next the windws will be broken and left un-fixed I'll wager.


Although, even when lived in nobody bothers to maintain the pleasing appearance. E.g. The 'Levante' (I think) flats on the end of Melford Rd (opposite Barcelona, where the smart timber cladding is now either bleached by the sun, or has peeling varnish hanging off.

Link to comment
https://www.eastdulwichforum.co.uk/topic/10116-new-flats-on-underhill-road/
Share on other sites

Yes, they've been empty for several years. They lowered the price a few times, but they just wouldn't shift. I don't mind the building too much, but it is an acquired taste. The rooms are strange shapes, and apparently the finish is poor.


I don't think they're on the market any more, perhaps the developer has gone into administration?

Ive been an agent in SE22 for several years and I can tell you that these places are the perfect example of developers not having a clue what the local market want. Horrendously overpriced, too far from a station to attract young professionals, poor finish, odd shaped rooms so impossible to use the space on offer (ie, nowhere to put a bed or wardrobe to the wall as curved walls), etc etc etc.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...