Residents of Melbourne Grove will be only too aware of the ongoing works re-laying the pavement. Since shortly into the New Year the works have inched up the street and are currently spread out all the way between Chesterfield Grove and the junction with Lordship Lane. When I say ?works? I mean that work has started but then seemingly halted, but with the parking still suspended on the left hand side, materials littered everywhere and little sign that things will be resumed soon. There has been absolutely no progress this week between Chesterfield Gove and Bassano St.


No doubt reasons can be offered, but anyone vaguely familiar with project management is bound to wonder at the seeming randomness of the approach.


Bearing in mind that this is Council Tax money being spent (and I know it?s subcontracted work), the ridiculousness of apparent lack of planning is now emphasised when tarmac that was laid at the beginning of the week is currently being dug up by ?Fourways Water? to complete work started before the tarmac was laid! Are the various managers involved not on speaking terms?


Does John Barber have a view on the lack of efficiency with these protracted works and how long the residents of the area are likely to have to put up with the disruption? I know it?s not the end of the world to negotiate the building works onto the road while vehicles hurtle past, and I?m sure the pavement will look lovely when it?s finished, but at the current rate we?ll be inviting the workforce in for mince pies and mulled wine. And they have yet to start on the other side of the street?!

I can vouch for the fact that work has been progressing at a cracking pace at our end of Melbourne Grove (the Lordship Lane/Police station end). I wonder if the fact they've downed tools in your bit of the road and moved on to my bit (where it looks amazing and done in double-quick time too) might be anything to do with the house that's got scaffolding on the pavement - perhaps they've given up on that stretch for now?

I made a point of walking down Melbourne Grove over the sunny weekend.

I could see a couple of small areas where the pavement works were still in progress. One of then was full of shredded tree which would need to be removed before paving could happen. Suspect that has held these two sections up.

I could see some snagging issues for completed areas. Other than that lots of progress sicne the previus weekend.

Hi Magpie,

Sorry you've not spotted the context.

When renewing the road surface it makes it hard to go back later and renew pavements as the kerb line is often affected by pavement works.

So the pavements are renewed first THEN the whole of Melbourne Road will be renewed.

That how Dunstans Road has progressed, Crystal Palace Road road will have its road renewed from 22 March, and not so long after than Melbourne Grove.


All these works were started at planning stage last July and part of the 09/10 planned programme of street renewals and maintenance.

Think your last line gave you away there:


All these works were started at planning stage last July and part of the 09/10 planned programme of street renewals and maintenance.


There is an immediate need to repair potholes throughout the area - waiting for all the pavements to be replaced, and then the whole road to be resurfaced, will do nothing to fill in the two potholes in the middle of the pedestrian crossing on Lordship Lane near the Magdala pub (for example).

Jeremy Wrote:

-------------------------------------------------------

> I agree that the potholes need fixing, but I don't

> agree that it should be at the expense of other

> scheduled work - for which the wheels have already

> been set in motion.


Well put.

If the potholes are genuinely dangerous then report them so a decision can be made. In the meantime as we're all well aware there's lots of pot holes around at the moment I will be driving round them.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • There’s a line of stationary buses with hazards on ,from East Dulwich Grove to  Goose Green roundabout blocking traffic so it has to use the wrong lane at the zebra to cross the roundabout. No idea why.
    • Digital rubber necking ?  That's a meaningless phrase. The OP merely was seeking information.
    • Reviving this to say that Palais is now up and running.  We went to a night there yesterday.  It is a first floor bar with cocktails and space for a DJ.  That I think is intended to be a quieter space for an older/more chilled crowd.  There is also a basement club space that can hold 500, it has an amazing sound system. The communal areas are still a bit rough and ready, they still need to do some replastering and painting on the stairways and there is currently no functioning lift.   But generally it was well run and thoughtfully restored. It was good to see the space back in use and it feels like a good addition  to that end of Peckham. Interestingly, showing a shift in night time cultures, there were signs about not using mobile phones and everyone had to get a blocking  sticker put on their phone camera lens before they were allowed in. 
    • Great shout. They do need the extra fat when it’s winter, but don’t use fat balls from April as they are dangerous for nestlings as the babies can choke on lumps of the fat. When it gets milder switch to suet pellets as they are harder and don’t melt (the grease is bad for feathers.    
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...