Jump to content

Recommended Posts

ooh shell no need to nip to the tip ,a lot of us will like your bagged up leaves ( just leave for 18 months or so and voila leaf mould for soil conditioning and mulch ) .


If you're fairly central East Dulwich say the word and I'll be round .

intexasatthe moment Wrote:

-------------------------------------------------------

> ooh shell no need to nip to the tip ,a lot of us

> will like your bagged up leaves ( just leave for

> 18 months or so and voila leaf mould for soil

> conditioning and mulch ) .

>

> If you're fairly central East Dulwich say the word

> and I'll be round .



Hey, I have first dibs :))


Shell, I've PMed you!


Had assumed your collection was today, like mine,but if is isnt I can collect anyway.

shell Wrote:

-------------------------------------------------------

> thats so nice of you Sue. Hopefully they'll

> collect or i'll nip to the tip



Oh please no, not a 'Xmas hunt the Cassis in the leaf pile' game is it Sue


Poor Nyjelle , can't he just have a knitted jumper this year?

Hi Shell, if you leave the leaves in the green bags next to your brown bin, they should get collected on your brown bin collection day. The leaves will be composted at the recycling centre.


If you have too much recycling for your blue bin than leave the overflow of recyclables in a clear bag next to your blue bin.

Renata

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...