Jump to content

Recommended Posts

Hi I am hoping someone knowledgeable in the ways of property can help.


We have bought a 3 bed terrace. Originally there was a small bathroom in the middle house (about 2m x 2m) and a single third bedroom at the back of the house - about 3m x 1.7m or so. A previous owner has moved the wall between the rooms and swapped their use over, so there is now a large bathroom with freestanding bath, seperate shower where the third bedroom was and a small box room in the middle of the house that is currently used as a large cupboard...


We want to make sure we have a useable third bedroom (even if it is small) so have two choices:


1) Keep bathroom at back of house but make it smaller (and lose seperate shower) - thereby increasing size of box room back to original size - 2m x 2m, which could be used as an additional single bedroom (for small people). This would leave us with a bigger bathroom but smaller third bedroom.


2) Move bathroom back to where it was in middle of the house. This would leave us with a small bathroom, but bigger single third bedroom (about 3m x 1,7m).



Would be grateful for thoughts on which of the two options above is likely to make house more saleable as we would be happy enough with either of them.


Thanks!

Do you need the bigger room for use right away? You talk about resale but have only just moved in! If it is spare capacity for the moment then why not enjoy the decadence of a larger bathroom for a bit. In due course you can switch the 2 rooms back to the conventional layout whether because you need a bigger bedroom or because you are trying to maximise your sale price. Of course if the bathroom is a bit naff and you are getting it redone then you will want to get it right first time...


Do you mean 1.7m by the way? Doesn't sound right unless the the back of your house isn't square.

Thanks for all the advice. I think that having a larger bedroom is probably the right call.


Yss, the third bedroom at the back would be would be about 1.7m deep (maybe a bit more) and 3m wide. Fine as a kids single bedroom I guess.


We thought it would be nice to get all the work done sooner rather than later but the more I think about it, it may be a better idea getting the whole lot down before we sell when we are ready to leave.


Cheers

trizza Wrote:

-------------------------------------------------------


> done sooner rather than later but the more I think

> about it, it may be a better idea getting the

> whole lot done before we sell when we are ready to

> leave.

>


xxxxxx


Just a thought - someone might prefer to buy the house as it is and get the work done to their own taste, so unless you'd actually make money on making the changes yourself, or unless an estate agent recommends otherwise, why bother having all that upheaval?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...