Jump to content

Recommended Posts

Southwark has issued a final advertise for a new Traffic Management Order for the Camberwell Grove bridge over the railway line to have a weight restriction limit. This is in keeping with returning Camberwell Grove to alternate one-way signal controlled operation for motor vehicles. This new order will come into force 25 June unless some one objects. At some point after this the road will be so re opened.
  • 2 months later...

concerning the post that says


"Paul Lupton Wrote: The sooner vehicles can use the bridge again the better - Bellenden is overrun with traffic "


Say after me 100 times


"Roads create traffic"


e.g https://bettertransport.org.uk/roads-nowhere/induced-traffic

nunhead_man Wrote:

-------------------------------------------------------

> concerning the post that says

>

> "Paul Lupton Wrote: The sooner vehicles can use

> the bridge again the better - Bellenden is overrun

> with traffic "

>

> Say after me 100 times

>

> "Roads create traffic"

>

> e.g

> https://bettertransport.org.uk/roads-nowhere/induc

> ed-traffic


But there is evidence that the closure shifted traffic to less suitable roads. If a closure of Bellenden (and associated side roads) was on the cards I might agree with you. But the choice was between closing the bridge with no mitigation for other roads or reopening the bridge - in that case the choice for residents in and around Bellenden was obvious.

The closure of CG caused unbearable strain on surrounding roads. Reopening it isn't going to create more traffic.


nunhead_man Wrote:

-------------------------------------------------------

> concerning the post that says

>

> "Paul Lupton Wrote: The sooner vehicles can use

> the bridge again the better - Bellenden is overrun

> with traffic "

>

> Say after me 100 times

>

> "Roads create traffic"

>

> e.g

> https://bettertransport.org.uk/roads-nowhere/induc

> ed-traffic

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • How long is a piece of string?  Depends whether you are building 'new towns' or brown field urban sites. I expect developers, planners and builders know far more than we do.  Where are you getting your information about infrastructure from ?  Your comment on new reservoirs seems more relevant to population expansion and/or climate change.
    • There was a previous thread about them about 6 months ago. Since then, they have been found guilty and fined for illegal street trading and collections in June in the City of London. https://news.cityoflondon.gov.uk/we-r-blighty-pleads-guilty-of-illegal-street-trading-and-collections-in-the-city/  
    • The Government has set an ambitios target to build 1.5 million new homes bu the end of this 4 year term. Possibly unachievable due to various issues in the building industry but ambitious none the less.  What they seem to have failed to plan for, which was brought home by this year's drought, is adding more inferstructure including Reservoirs, power lines and sewerage treatment centres.  Ate they setting us up for more problems in the future? 
    • If you know the layout of the Chequers estate, it is clearly unfeasible and logistically complex to project images onto the facade of the main building. Unless you are the military or something.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...