Jump to content

Recommended Posts

Has anyone else noticed a complete lack of ANY work being done at Denmark Hill train station? I haven't seen a single workman there in the three months the scaffolding and temporary bridge went up. I'm half wondering if they've just run out of money for the project.

Oh, hang on, they have managed to cut some trees down. Wow.

teddyt Wrote:

-------------------------------------------------------

>I haven't seen a single workman there in the three

> months the scaffolding and temporary bridge went

> up.


I'm guessing you've been looking in the day time. Due to the proximity with a live track I would have expected most works to be done at night when there are no trains.

PSJ Wrote:

-------------------------------------------------------

> I was thinking the same, but when passing their

> today they were working at laying the path from

> the main road to the platform.

Safety rules won't prevent all work from being done during the day, only those things that carry a risk of falling onto the track, materials slippage, machines that could slew across the track or into any live equipment etc. That often means that no work is done during the day but laying a path sounds like something that could be done with no inherent risk.

If you look carefully you'll seem some huge polysytrene blocks. These are used to fill in the gaps between platforms when they're working on site enabling workers to easilly get around and move materials and equipment. To use these blocks they must be getting line closures. So I suspect most work it planned to take place at night time or weekends with train line closures. They plan to now finish summer 2012. I suspect before 1 July when the Olympic madness really cuts in. So I don't get any idea of a great rush and wouldn't expect more than one shift working on site doing nights. Which means most of us wont see much happening until new foundations in place and then above ground visible works.
  • 2 months later...

Still not a lot of movement 7 blokes standing around the one hole since christmas.

I am wondering if the have turned the polysytrene block into polysytrene tea cups as they always seem to be drinking tea.


Also this only seems to take place between the hours of 09.00 - 1400 then all you see is dust fron their vans leaving site.

  • 6 months later...
Does anyone have idea what is going on at Denmark Hill Station? They closed the main station entrance for months and erected a tempory footbridge, now the station is open again but looks identical to before (albeit perhaps with a lick of paint). I thought they might have at least done something about the crazily narrow doorway which is a total bottleneck when busy in the mornings. I have seen drawings somewhere of a gleaming glass and steel footbridge with lifts included, but progress in constructing this seems unbelievably slow. Summer 2013 now looks more realistic.

postboy Wrote:

-------------------------------------------------------

> I'm waiting to see if the station will become

> accessible as my husband is disabled and has never

> ever been able to use that station, also applies

> to East Dulwich.



All of the publicity about the redevelopment is very clear that step-free access is one of the main things they are doing.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Wow, well served with local supermarkets then…  Agree with ATM.. good c position to been mugged or cloned card - prob why not been considered before. Wasn’t there one outside post office and still  is2where people were abit nervous of using? Hope I am wrong but won’t see me rushing to use it…sure lots of folk will benefit thou. Not a great fan or user of Iceland but when it closed years ago people complained..  Guess they only b look at bigger sites - can’t recall an express one but a pity to those who frequent the store. Strange that Tesco can use it as local but Iceland can’t - guess it is  power of large supermarkets. Personally would have  loved an Aldi or Lidl but  clearly site to small. Only grocery stores left to come are Waitrose, Aldi, Lidl… 
    • I'm paying £31 pcm for full fibre 300, whatever that is. I'm not sure it's a particularly good deal now, but I did a comparison at the time I went onto it, and it was then. I don't have a landline any more, and my mobile is with iD, who piggyback off 3. I don't usually have any problems,  except once a few years back when the whole 3  network (?) went  down for quite a long time.
    • I have Plusnet too.   I recently (August) had some problems with WiFi connection on different days but and the turning off and turning on didn’t work.  The WiFi didn’t work for quite a few hours - overnight in one case but eventually rectified itself.   Would be interested to know how much other people pay for Plusnet. I also have a landline with them as the mobile signal is bad inside house.  That is with EE and I want to change from them to another provider.
    • That's terrible 🤬 Was it the same company both times?
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...