But I can't stand shoddy workmanship. This is the brickwork done today opposite the coop on LL by the contractor appointed by Southwark Council. I know the faults in this work and I'm speechless. If anyone knows about brickwork and would like to comment, I would be very interested in hearing if you think this is passable and if so on which planet.


I have added two photos, can anyone see them?

fazer71 Wrote:

-------------------------------------------------------

> Umm what does it look like on the inside ?

>

> The outer area may look like that so the hardcore

> mixed with concrete bonds better.

>

> But it does look a little odd...


I've added a picture of the interior here, I hope it's visible. Thre's no mortar between some of the joints at all, none of it is pointed, other bricks are not lapped correctly. Either it doesn't matter or it does. I believe it does matter and not just aesthetically but structurally.

There's not much to interpret, it's shite work, really shite.

It's not bonded at all (technique for overlaying the bricks and building corners for strength), the joints look empty, the vertical joints are inconsistent. You'd have to gamble that if the same level of skill was deployed to mix the mortar, then this is an absolute disaster.

The only conceivable reason I can believe anyone has done this in broad daylight is in the hope that no-one pays too much attention before the footings are covered and the problem buried until inevitable structural problems occur.

If you know who's paying for this, bring it to their attention with these pics because this is total robbery.

fazer71 Wrote:

-------------------------------------------------------

> Yes Shocking !

> But it looks like it's only for cables and once

> there's a lid on it no body is going to see it.

> Maybe that's what's required.



Yes, what you say is true, it is only for cables and not sewerage or water. I wonder myself if it matters but it's just not right. No builder who has received any training would produce this.

KidKruger Wrote:

-------------------------------------------------------

> There's not much to interpret, it's shite work,

> really shite.

> It's not bonded at all (technique for overlaying

> the bricks and building corners for strength), the

> joints look empty, the vertical joints are

> inconsistent. You'd have to gamble that if the

> same level of skill was deployed to mix the

> mortar, then this is an absolute disaster.

> The only conceivable reason I can believe anyone

> has done this in broad daylight is in the hope

> that no-one pays too much attention before the

> footings are covered and the problem buried until

> inevitable structural problems occur.

> If you know who's paying for this, bring it to

> their attention with these pics because this is

> total robbery.


Who is paying for it indeed. It's publicly funded I would have thought so you and I are paying for it, aren't we?

It's only for cables to terminate into underground, and it looks solid enough to do the job.

The bricks used are engineering holed bricks and the mortar goes through to hold them together one row of stringers and another of headers underground it'll do the job for 100+ years.


Yes its not pretty but I doubt it needs to be as it'll be hidden from the world underground until an engineer opens it to make connections or run new cables.


If it was made perfect around the outside the hard core would just slip past it and then it could move over time.


The more I look at it the more it makes sense.


What benefit would there be to spend time and effort to make it look nice and make every joint perfect?

Not much point it wouldn't do the job any better.

I have retired from the building trade for many years, this is shoddy work ( I do not use the term Workmanship.)

The person who built this is not competant or abe to take pride in this very poor exhibit.

If this was done by any of my former employees they would be sacked on the spot and any wastage of material deducted from their wage.

I can only assume:

These pipes are not for sewage, they are flexabe with only a spiral steel wire to keep them rigid, the inner is ridged and would not permit passage of effluent and soon block, these outer pipes whatever they are intended for will crush under the outer refilled groundwork. If this is an inspection chamber it should be water tight as seepage into it will soon fill the chamber and flow back along the pipes to what? A lower cellar or basement.

If it is intended to be a connection to the sewers there are very strong inspection standards by the Local Authority if inspected by them.

It amazes me just how poor work is so readily accepted these days, if you pay your money you want the job done. correct.

If it is not on your property, you can only make the situation aware to the owners, or if you think it is a hazzard phone the Council Planning Dept.

No there is nothing wrong with YOU.

It's a subterranean service manhole. What did you expect, London stocks with weather struck face work & a few Red-rubber 'coins' on the corners?


It's made from hard engineering bricks and is smooth enough on the inside for the purpose required. And it will probably get backfilled with a bit of concrete or lean mix after, which shores it up.


I don't know what you do for a day job, but the printer might need more paper, or the ink cartridges need ordering from Viking or something equally as important.



NETTE:-S

How much Paper or Ink do you use when posting here?

Why order from Viking at their prices and you must place it for at least ?30. less Vat for free post.

Their ink is ?8.99 Each.

I get my ink from Amazon compatable T711/T714 ?14.90 for 20 cartridges

No, someone clearly unskilled is laying bricks which are not bonded and NO effort has been made to do a basic job.

You could not do this job so badly if you'd had ANY training in brick laying or basic building. The fact it'll be eventually buried and not carry sewage is irrelevant to how fit for purpose it is. Any works inspector would not sign this off, it's sub-standard, the absolute minimum possible has been done. Funnily enough there are so many posters who demand quality builders on this forum, yet propose shite work is OK as long - as it's done elsewhere, presumably !!

A chamber even for holding cables, needs to bear it's own weight and the sideways forces from the surrounding terrain, to ensure best chance of longevity the bricks need to be laid squarely, corners completed and bonded properly. If not, the longevity of the structure cannot assumed, it's just down to luck. If you judge this work as acceptable you're not going anywhere near my ferking printer cartridges !


London stocks would be a stupid choice of bricks as they absorb moisture as I'm sure you know. The engineering bricks used ARE solid but the bricks on their own don't ensure a viable construction - obviously.

Email to;

[email protected]

or call at the Town Hall corner of Havil Street, It might get things moving if you say you have got into contact with Dom Littlewood's who investegates Cowboy Builders from Hell.


http://www.dominiclittlewood.com/contact.html

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • It's the "due to commercial reasons" line again that is vexing. Last year it seemed, although there was a similar level of objection, that the reasons were commercial - Gala didn't appear entirely prepared to run 3 more events, or more likely didn't have sufficient interest from other promoters / organisers who could 'sub-let' the site as with Brockwell Park (I believe?). This year they appeared more organised, had another year to plan & prepare, to the extent they actually had names for two of the three new events which indicated to me that they had third party promoters / organisers in place.  So yes, it does make you wonder whether the repeated level of objection, combined with the impending elections, led to the council 'advising' that maybe they shelve it again? I'm afraid I can't see the whole extension application just being a ruse to guarantee permission for the 'regular' event. Gala are a commercial venture with ambition - every festival's business plan is to expand, expand, expand, year on year on year. Gala won't give up until they have taken over the whole park for a Summer of Raves, and the mysterious owners are on their yachts counting their ££££
    • Thanks for that. Maybe forthcoming elections have stymied the 7 day request? If Labour get back in, do we think GALA will try with greater success in 2027?
    • Better late than never, same obscure reason as previously for not going ahead with the extended plan... "Due to commercial reasons, the event organisers have withdrawn their application to hold a 7- day event over two weekends. The application has been revised to request the use of Peckham Rye Park to hold a 4-day event over one bank holiday weekend with the following schedule: • Onsite: Monday 11 May 2026 • GALA: Friday 22 – Sunday 24 May • On the Rye Festival: BH Monday 25 May • Off-site Sunday 31 May 2026 This is the same event programme that was delivered in 2025."  GALA 2026 consultation findings report 1519.pdf
    • Do great pizzas there at community cafe.. lots going on — was free parking but plans  to like everywhere get folk to pay.  Nice area… only discovered it a few years ago..   
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...