Jump to content

SAT 6TH APRIL: Yoga and Mobility Workshop: Freeing up the Hips, Spine and Shoulders


Recommended Posts

Saturday 6th April

12-2.15pm

Zen Yoga Camberwell

?30


This yoga and mobility workshop is designed to strengthen and free up all the muscles around the hips, spine and shoulders.


In this two hour workshop, you will learn how to cultivate a greater range of motion and flexibility in key areas of the body: the spine, the shoulders and the hips. By using certain drills and sequencing to educate the nervous system on how to express this range of motion, you will learn how to build a greater degree of flexibility and mobility throughout the whole body. But most of all, we will have a lot of fun, learn some new transitions and have plenty of time to PLAY.


This workshop will not only help to improve the flexibility and strength, but it will also help alleviate back and hip pain, improve your posture, teach you how find freedom in these areas with yoga poses and exercises that you can take back home to your own mat. We will also explore the function of the hips, spine and shoulders in creating a strong and supported backbending practice, working to open up the thoracic, middle and lumbar spine as well as the muscles of the shoulder. The workshop will incorporate creative yoga sequences, mobility exercises and drills, and will end with some relaxing yin yoga and savasana.


All levels of practitioners are welcome, including beginners. Email me at [email protected] for any questions.


BOOK HERE: https://www.eventbrite.co.uk/e/yoga-and-mobility-workshop-freeing-up-the-hips-spine-and-shoulders-tickets-58459811871

Archived

This topic is now archived and is closed to further replies.

  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...