Jump to content

Recommended Posts

I'm still struggling with which bit was the dullest.


Tess Daly's utterly vapid piece from Battersea Park or pretty much anything that involved Fearne Cotton.


I quite liked Huw Edwards' crestfallen 'The rain did have an effect' line at the end though.


He was only a couple of pints away from saying 'What a load of old bollocks that was'.

Link to comment
https://www.eastdulwichforum.co.uk/topic/23763-floatilla/#findComment-549773
Share on other sites

I was there - and the best part of the Flotilla was the man powered section - hundreds of oar powered vessels crowding the river and squeezing through Tower Bridge in a messy and unchoreographed sequence made an great impression - I did see some of the TV highlights and TV somehow diminished the whole event - the boats appeared too small and the river too large. However, close up it worked. The various musical elements also added much - the final finale after the singing "Hope and Glory" with the London Symphony playing a Hornpipe ever faster was just great.
Link to comment
https://www.eastdulwichforum.co.uk/topic/23763-floatilla/#findComment-549784
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • You'd need to get a proper quote (or three) for instance removing a cast iron bath is a very different job from removing an acrylic one. Again what pipe work will be being joined into - matching old imperial pipes with modern metric ones is different from like to like, as is dealing with a copper or an iron distribution system. The amount (area) of retiling required is an issue, as will be the state of the wall behind the tiles. It may of course all be very plain sailing, or not. Have a first look at plumber recommendations on the relevant pages on this site. If it's all easy then 3 days work may be sufficient. But it could be a week if there are snags. 
    • Hi. Can anyone suggest a plumber for the job below? Replace bath tub with a shower enclosure, putting pipes to showerhead behind wall, re-titling damaged/removed tiles Also any idea of the costs involved for the labour as we will buy the items required?
    • Aria came round to fix my tub drain when I'd messed up the seal. Came within hours, fixed the tub, and ran a bath to make sure it was okay. Here's where the fun starts. While he was over, I asked him questions about the rest of the plumbing round the house. I had just moved into a Victorian home that was previously being rented. Unsurprisingly, we found another leak in the tub and a drip in the kitchen tap.  He came back the next day to put a better pipe in my bathtub and replace the kitchen sink. Painstakingly figured out how to replace the hard-to-access kitchen sink without cutting through the wood panel with the help of his builder friend, Mark. Answered all my questions and clearly knew his stuff. All this right before Christmas holidays! 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...