Jump to content

Recommended Posts

Why on earth are there traffic lights managing these roadworks?


Outside JAGS school on East Dulwich Grove.


1) adding chaos to an already chaotic area given recent traffic changes.

It added 20mins of travel time the other night.


2) the works are encroaching the carriageway by a MAXIMUM half a meter. All it needs is a couple of cones.


Who decides this stuff?? - and signs off the budget?

Link to comment
https://www.eastdulwichforum.co.uk/topic/268706-why-traffic-lights/
Share on other sites

To give Cllr Newens credit she has been chasing Thames Water via her twitter feed as she highlights the fact that nothing has been happening and it has been causing disruption.


Thames Water replied to her original tweet that: "We'll be unable to remove the barriers until the permanent reinstatement has been applied and had a few days to settle because of safety concerns".

Penguin68 Wrote:

-------------------------------------------------------

> It used to be that councils would prevail on

> utilities to clear roadworks, but now Southwark at

> least relishes anything which will further disrupt

> traffic. Or that's the way it seems.



Conspiracy theories abound.

perhaps you should drive through the barriers, then you can moan about the sinkhole that collapsed and swallowed your car?



ED Light Wrote:

-------------------------------------------------------

> Why on earth are there traffic lights managing

> these roadworks?

>

> Outside JAGS school on East Dulwich Grove.

>

> 1) adding chaos to an already chaotic area given

> recent traffic changes.

> It added 20mins of travel time the other

> night.

>

> 2) the works are encroaching the carriageway by a

> MAXIMUM half a meter. All it needs is a couple of

> cones.

>

> Who decides this stuff?? - and signs off the

> budget?

That?s pleasant, thanks


redpost Wrote:

-------------------------------------------------------

> perhaps you should drive through the barriers,

> then you can moan about the sinkhole that

> collapsed and swallowed your car?

>

>

> ED Light Wrote:

> --------------------------------------------------

> -----

> > Why on earth are there traffic lights managing

> > these roadworks?

> >

> > Outside JAGS school on East Dulwich Grove.

> >

> > 1) adding chaos to an already chaotic area

> given

> > recent traffic changes.

> > It added 20mins of travel time the other

> > night.

> >

> > 2) the works are encroaching the carriageway by

> a

> > MAXIMUM half a meter. All it needs is a couple

> of

> > cones.

> >

> > Who decides this stuff?? - and signs off the

> > budget?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Their food is lovely, but unfortunately the waiting time for it is sometimes so long, even when they don't seem particularly busy, that we no longer go there. We used to just accept it, but seeing people who came in long after us getting their food before us was the last straw after we had waited well over half an hour, if memory serves. It might have been nearly an hour, but I can't remember exactly, it was a while ago. We paid for our drinks (which had come quite quickly) and went to have lunch elsewhere. We reckoned we would get our food quicker that way. We were very  hungry by this time! It's a shame, because we would like to support them as they are a small local business with great food, but there seems to be some problem on the kitchen side (we were assured that our order had been given to the kitchen as soon as we made it - we asked earlier, as we thought maybe it had been forgotten, but no).
    • This is a bit niche 🤣 I like  Kargs cheese and pumpkin seed crispbread, but it's quite expensive even when it's on offer. So when M&S started their own brand,  I used to buy that sometimes. It was different from Kargs, but ok. Then it disappeared from the shelves for ages. I assumed this was due to the supply problems after M&S  were hacked into. So I was quite pleased recently to see it had returned. But it now tastes revolting (in my opinion). I have no idea what was in it before, as I had no reason to look, but on checking the ingredient list now,  the second after wheat flour  is cornflour (?!), and it's also got palm fat, rapeseed oil, cheese powder and potato starch. And some other stuff. Plus some  actual cheese. I can't find anything online to say the recipe was  changed, so maybe my taste buds have suddenly become more sensitive, but after reading this, I'm appalled M&S are selling this rubbish. Has anyone else noticed any changes? I'm assuming they waited some time so customers would have used up what they had and couldn't make a direct comparison, but that might be a hideous slur (if so, apologies to M&S). Kargs use sunflower oil, and have  none of these other weird ingredients. I shall be gritting my teeth and buying only Kargs from now on. Disclaimer 1 : I don't have any shares in Kargs. I wish I did, I might get a discount! Disclaimer 2:  Yes I have many better things to do with my time than post on here moaning about crispbread, but I am having a tea break (just preempting another attack from those people who haven't got better things to do with THEIR  time than post on here to randomly attack other posters for no apparent reason).
    • There is the Blue Brick Cafe for vegetarian food too.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...