Sue Wrote:

-------------------------------------------------------

> first mate Wrote:

> --------------------------------------------------

> -----

> > Still, once it is done pedestrians will have a

> > 'nicer' experience, so has to be worth it.

> >

> > I quote JB from an earlier thread last year

> >

> > " The NXR/LL has a number of pedestrian

> movements

> > but primarily these works are to make this

> > junction more pleasant and a better

> experience."

>

>

> But according to the plan above, all that is being

> done is "resurfacing".

>

> Do you have a link to the other thread you

> mention?



Look at post Southwark nx road plans 11 nov 2014. Shows more than just resurfacing. Cllr Barber responses to all


You might have to dig not too good with it but it's there

Dog duck Wrote:

-------------------------------------------------------

> Why not just treat it as a 'pop up' inconvenience?


Yes . Exactly..


It's a minor inconvenience if you need the bus stop..


The crossing is still in place..

BUT Iceland has now gone. I'm sure it will all be fixed by the time M&S comes to town.

Otherwise there will be riots.


Foxy

But the point is, it's an "inconvenience" which is going on far longer than it should because nobody is bloody working on it.


And it's probably not a "minor" inconvenience if you have a disability which means it takes you much longer than most people to walk to another bus stop.


GRRRRRRRRR.

James Barber Wrote:

-------------------------------------------------------

> The junction works involve concrete which has to

> be left to set properly or it will have a shorter

> life span.




Ah OK, fair enough then, (nearly) all is forgiven :)

Just to note that the workmen are out there today installing kerbs.


I was so happy to see this that I chatted to the guys and asked what the hold-up was and they said that they had to wait for the granite kerbs to arrive from China.


The kerbs should be done by Monday and then they'll install the pavement, so hopefully it will all be done by the end of next week, fingers crossed.


The granite deliver delay isn't a wind-up, this has happened before (the Melbourne/EDG raised junction for example)... Southwark orders in bulk to save money (not just from China, there have been delays from Ireland as well), but works get delayed when supply runs out of the specified units.

  • 2 weeks later...

Pleased to report that they are charging through the road works at the moment at least 3 stones completed a day................


Really can they go any slower ?


There are no more then 4 workmen on site at one time and by the looks of it 2 have to be talking and eating or sitting ?


WTF how slow when is the completion date 2018 ? Totally acceptable for a main road to take this long,

James Barber Wrote:

-------------------------------------------------------

> The length of time being taken is quite

> astonishing. Pease accept my apologies that the

> contractors FMConways are being allowed to do

> these works so very slowly by Southwark Council.

it will be great when finished but.


But what exactly is it ??


DulwichFox

bob Wrote:

-------------------------------------------------------

> Making the pavement almost twice as wide and the

> road twice as narrow ??????

> Bob S



Will reduce the cost of a barrier if Cllr B thinks it might be a good idea if someone considers it a good idea to boost property valves

bob Wrote:

-------------------------------------------------------

> Making the pavement almost twice as wide and the

> road twice as narrow ??????

> Bob S


Hang on, lads; I've got a great idea.

Let's pedestrianize Lordship Lane, back track on the Melbourne Grove scheme and send all the Buses through there.



DulwichFox

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • Hi all, Wondering if anyone else in/around SE22 is also having the unfortunate luck of having Evri parcels delivered by a very rude individual? Whenever we have parcels delivered, our front gate is being slammed open and closed, ring doorbell is harshly banged (not pressed) followed by simultaneously banging on the door knocker and slamming the letter box multiple times. Someone is normally home by the time they come in the evening and never has to wait long for an answer. If we’re not home, we speak to them on the doorbell so we do find the actions of this individual unreasonable and rude.  We have tried a couple of times politely asking that they not do this but they are very dismissive and gives a passive-aggressive “have a nice day” reply.  Has anyone been able to contact Evri and successfully had any issues similar to this resolved? We have enough evidence through our doorbell footage but we are lost with what else we can do. We’ve tried asking politely but don’t want our gate or door damaged by someone who simply doesn’t care and lacks basic manners.    If anyone else is having this issue or has any advice on how we can report this, it would be much appreciated. After another dismissive reply to my concern this afternoon, I will be calling Evri tomorrow to raise a complaint. I have lost my patience with them 
    • Corbyn was unelectable - he got trashed by Boris who was a buffoon. It was a good job too because I would have hated to see Corbyn and his rag-tag bunch of far-left university politics backbenchers try to lead the country through Covid.  It is completely understandable why Starmer and the Labour Party want to purge Momentum from within their ranks and Cllr McAsh has fallen victim of that.
    • Ozzy Osbourne  https://www.theguardian.com/music/2025/jul/22/ozzy-osbourne-black-sabbath-frontman-and-icon-of-british-heavy-metal-dies-aged-76
    • Hello.   Thanks Nigel and Hparker 😀   I've got new slots available for new students looking for a piano teacher or guitar teacher.   You could start in the new term beginning September, or I'm also available adhoc-styles through the summer holidays at times.   I teach all ages, in most styles, in lots of different ways according to how you learn/like to learn.   Give me a call or text on 07730 402336.   I have connections to lots of performance opportunities/networks too.   I run regular events /student concerts, and play in bands/perform.   Natalie. 
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...