Jump to content

d.b

Member
  • Posts

    103
  • Joined

  • Last visited

Everything posted by d.b

  1. cle Wrote: ------------------------------------------------------- > Could it split at Camberwell into two branches? > > A short one to Denmark Hill (station) and then > East Dulwich. Possibly on to Dulwich (by the > Plough) and Forest Hill/Catford. > That would be great, it would definitely ease congestion at Camberwell, link together different rail lines at DH, ED, and FH, and generally make transport links a lot more sensible in the area. A station somewhere between ED and FH would be ideal, since there is a fairly wide residential area in a "hole" more than 20 mins walk from any rail station right now. Downside is, it would be new track/tunnel all the way so no cut-price option for rail planners, so not much chance of it happening.
  2. Agree the numerical reasoning is poor... to define excessive at 85%, then say 3 in 20 are excessive is meaningless. 3 in 20 are "excessive" anywhere and everywhere by that definition. Pedantry aside, I don't think 22.4mph at the 85th percentile seems very high, actually. That's in keeping with what I see walking down melbourne grove as I do every day, twice a day. LalKJ, I don't recognize the "major problem", I almost never see lorries, and I don't see traffic "gun down it as fast as possible" either. Having occasionally driven a hirecar around the area it is not a road to drive fast down, the parked cars and speedbumps do a decent job at slowing you down already. I think a 20mph zone is entirely unnecessary.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...