Jump to content

Recommended Posts

  • 3 weeks later...
Now some of the residents are holding a street party on the road on sunday august 6th 2pm to 5pm to try and get other residents to sign a petition. CG residents never cease to amaze me . Might turn up and argue my side and bring my own petition

Please see attached link below as to the current position. I'd urge you to forward to all your contacts and get them to write in as individuals and not one e mail per Familiy to Southwark on the address attached - [email protected] and come to the consultation in September. The surrounding streets can't cope and it wont be long before theres one Mexican Stand off too many...


http://www.2.southwark.gov.uk/info/200083/roadworks_and_highway_improvements/585/bridges_subways_and_walls/2

Many residents on Lyndhurst Grove and the surrounding streets are very concerned about the levels of traffic and pollution on the road, caused by the diversion of traffic from Camberwell Grove, because of the closed railway bridge. We have been petitioning for the bridge to be opened - but the people on Camberwell Grove are campaigning for it to remain closed. A number of us have been in conversation with Southwark Council, and we have said that the increased traffic on Lyndhurst Grove is extremely dangerous for parents taking their children to school, and most days there is a stand off, and huge arguments as due to all the parked cars the road doesn't allow for two-way traffic. It's also affecting the wider area of Bellenden Road and adjacent streets as all the traffic is funnelled down one route.


There is a meeting on September 20 to get local people?s thoughts and we want to spread the word. A high attendance is needed at the meeting to prevent the bridge being closed for ever. All the information is here.


http://www.2.southwark.gov.uk/info/200083/roadworks_and_highway_improvements/585/bridges_subways_and_walls/2

What the precious residents of Camberwell Grove should remember is that the road was a major road long before they pitched up.


This road did not appear overnight and all those purchasing properties in this road would have known this before they bought.


It is all about them and increasing the value of their properties, no more nor less.


This closing nonsense was thrown out at the last meeting when the neighbourhood turned out is force because they knew of the meeting.


Apart from this post I have not seen any official notification about the 20th September meeting. Why? Like most things with Southwark you have to be in the know and the fewer the better who know it can be passed on the quiet.

Typical NIMBY attitude. The same attitude of those people who opposed railways in the Victoria era. Noisy ambulances drive near my property towards the Kings College Hospital. How dare they? Maybe I should campaign against them...

Avondale Rise has definitely been busier since the bridge was shut. It can get a bit fractious sometimes if the P13 is squeezing its way up or down. The crossroads with Copleston can get a dangerous for pedestrians in the rush hours. I guess this is one of the 'longer' diversions to avoid Camberwell Grove entirely as a roughly north-south route. It really does need to be re-opened; streets are neither the property of, nor the private indulgence of, those who choose to live on them.

What about one of those temporary bridge decks that would sit over the existing road? One of those kind of military things?

Where/what time is the meeting on September 20th? - I don't see details on the links on previous messages.


I also live on Lyndhurst Grove, right where the road narrows to one lane, and the increase in traffic has been absolutely terrible - I have seen two arguments that have almost come to blows - and get horns beeping outside constantly. With the primary school just one block down - that has to be the main concern for everyone surely.

Personal view - the solution for Lyndhurst Grove is to intervene there as well - traffic calming and/or banned turns. Through traffic belongs on "A" and "B" roads, which are properly engineered for it. Residential streets are for.. well, clue's in the name.
Has Southwark Council anything to gain by failing to get the bridge opened? Seems a great way to put pressure on surrounding areas, perhaps with a view to limiting parking etc...? As others have noted, 17k is not so much- 3 bike hangars- perhaps it suits council officers to keep the bridge closed.

This seems like saying that taxes are what people richer than us should pay, with the threshold defining "rich" moving in line with our earnings! Lyndhurst grove, which then changes name to McNeil road, is a half-mile relatively straight stretch of road. Why ban it? Because it's not an A road? But wouldn't banning most traffic from non-A and non-B roads cause even more congestion? Btw, NIMBYs will be affected too, because they might see less congestion in their own road, but worse congestion down the road means more pollution - even for them.


Also, the structure of roads in London is extremely irregular, certainly very different from the orthogonal structure of other European cities. Closing a single road may mean long detours, which, again, mean more congestion and pollution, even for those who don't use a car. And, before anyone accuses me of being an evil motorist, let me say I do not own a car, and that I started commuting by motorcycle when the Southern Rail fiasco made my commute by train impossible.


The dispute between the residents of Camberwell grove and those of Lyndhurst Grove seems a dispute between two sets of NIMBYs: no one wants traffic on their road, but there is no consideration whatsoever for what might be best for the city as a whole, nor why...

"The dispute between the residents of Camberwell grove and those of Lyndhurst Grove seems a dispute between two sets of NIMBYs: no one wants traffic on their road, but there is no consideration whatsoever for what might be best for the city as a whole, nor why..."


I do not think it is a case of being a NIMBY, apart from the Grove residents as most other people just want the bridge to open to get traffic flows back to how it was before this recent closure.


Until the bridge closed there was not a problem regarding traffic flows in all the surrounding areas.


Bridge open..no problems, bridge closed.. massive problems.

Whatever your thoughts about the advantages and disadvantages of closing Camberwell Grove, I'm attaching a link which explains the council's current position and shows you where and how to have your say. Please circulate as widely as possible and make sure your own voice is heard on this! http://www.2.southwark.gov.uk/info/200083/roadworks_and_highway_improvements/585/bridges_subways_and_walls/2
Whatever your thoughts about the advantages and disadvantages of closing Camberwell Grove, I'm attaching a link which explains the council's current position and shows you where and how to have your say. Please circulate as widely as possible and make sure your own voice heard on this! www.2.southwark.gov.uk/info/200083/roadworks_and_highway_improvements/585/bridges_subways_and_walls/2

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • There was another unprovoked attack on Monday this week on a young woman nearby (Anstey Road) at 6.45pm. Don't have any other details, it was posted on a Facebook group by her flatmate. Pretty worrying  https://www.facebook.com/share/p/1EGfDrCAST/
    • OMFG is it possible for the council to do anything without a bunch of armchair experts moaning about it? The library refurb is great news, as it's lovely but completely shagged out - the toilets don't even work reliably. Other libraries in the area will be open longer house during the closure. July is a rubbish time to begin a refurb because it's just before the entire construction sector goes on summer holiday, and it would mean delaying the work another 8 months.
    • Licensing application for 2026 has gone in and they want to extend the event from 4 to 7 days accross two weekends.  There are some proposed significant changes to be aware of:   Event proposal moves to two separate weekends Number of days of the festival moves from 4 to 7 meaning also a change in the original licence is required Expected footfall in the park over the two weekends around 60,000.    Dear Peckham Rye Park Stakeholder,   Re: STAKEHOLDER CONSULTATION – event application: ‘GALA and On The Rye Festival 2026’ – ref: SWKEVE000935   We are writing to you because you have previously identified yourself as someone who wishes to be informed about event applications for Peckham Rye Park, or we think that you might have an interest in knowing about this particular event application.   Please be aware that the council are in receipt of an event application for: GALA and On The Rye Festival 2026’   In line with the council’s Outdoor Events Policy and events application process we are carrying out consultation regarding this application.   The following reference documents are attached to this email:   Consultation information APPENDIX A – site plan weekend 1 APPENDIX B – site plan weekend 2 APPENDIX C – Production Schedule APPENDIX D – 2025 Noise Management Plan   The consultation is open from Tuesday 4 November and will close at midnight on Tuesday 2 December 2025   Community engagement sessions will take place on Wednesday 19 November.   If you would like to comment on application: SWKEVE000935 and take part in the online consultation, please visit:   www.southwark.gov.uk/GALA2026   If you have any questions, please don’t hesitate to contact us.     Kind Regards, Southwark Events Team Environment and Leisure PO Box 64529 London SE1P 5LX 020 7525 3639 @SouthwarkEvents APPENDIX A - SITE PLAN weekend 1.pdf APPENDIX B - SITE PLAN weekend 2.pdf APPENDIX C - PRODUCTION SCHEDULE.pdf And just to add that councillor Renata Hamvas chairs the licensing committee. Worth contacting her with views on ammendments to the original license. I am fairly sure she won't grant any amendments, but just in case.....
    • Second time Aria has completed a plumbing job for me and both times he’s been polite. Communicative, kept to time and completed the job. He’s very helpful and tidy as well. First job was ball valve in water tank, not easy at all. He and his team were fantastic. This time kitchen tap cylinders replaced and tap tightened.  Much appreciated, Aria thank you.
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...