Jump to content

Recommended Posts

I went down and spoke to them... there appeared to be a hump in the road that has been causing noise and vibrations (causing structural issues) which apparently the houses on either side have been complaining about for some time. So, Conways is excavating it, removing the concrete underlay and replacing it with tarmac so that heavy vehicles won't cause bashing noises and vibrations.


They calculate that they will be done by tomorrow (Wednesday), but it looks like they have a displayed highway order up until Friday, presumably so that works can be extended in case anything goes wrong.


From memory, I don't think there was an actual speed hump there... there was an assessment years ago to implement a raised table across the intersection of the junction of EDG and Melbourne, but this was advised against - instead, the council only created pavement raised table crossings on both sides of Melbourne, but left EDG untouched.


I have a funny feeling that I remember what was behind the concrete reinforcement in this location... from memory, Thames Water installed a very complicated underground water sewer reservoir in this location (in the mid to late 1990s) to address some of the sewer floods in the area and they bookended the reservoir with concrete supports under the road so that vehicles wouldn't bash away at the underground structure over time, which could cause it to fracture and flood.


But I can't find anyone from highways to speak to... ironically, the redirection of the sewers towards this underground overflow facility has indirectly been causing other flooding problems up at the Lordship end of Melbourne for some time, but no one appears to have a copy of the EDG drawings.


BTW, the Conways guy I spoke to was lovely and very helpful... sometimes it's useful to communicate.

I have a funny feeling that I remember what was behind the concrete reinforcement in this location... from memory, Thames Water installed a very complicated underground water sewer reservoir in this location (in the mid to late 1990s) to address some of the sewer floods in the area and they bookended the reservoir with concrete supports under the road so that vehicles wouldn't bash away at the underground structure over time, which could cause it to fracture and flood.


If this is right, then Conways is undoing what was presumably necessary remedial and protective work by Thames Water which could then lead to more disruption etc. Including sewer floods. So they will be creating a problem, not solving one. Terrific. - In this case responding to local complaints, of course. But nonetheless...


I hope that when peoples' homes are flooded by sewer water Southwark will take full responsibility for compensation and restoration, as it will have been their work which undid Thames Water's restorative work.

Yep, Peng, this is what I'm worried about, as my house has been flooded twice due to the chaotic post EDG reservoir sewer re-diversions.


But, actually, I don't think the problem is Southwark Council... Thames Water's technical diagrams and management procedures are a nightmare... in addition to the incorrect sewer diagrams, I'm currently in complaint with them regarding damage to my home from a burst water main outside my house because of an incorrect technical clean water road diagram.


In the process of resolving all of this, I've tried several times to get a copy of the EDG underground water facility layout, but it sounds like this was never registered with the council??


Bear in mind that I may well be remembering incorrectly, but I'm still trying to track someone down to discuss... if nothing else, it's weird that there was an underground concrete barrier set under the road in this location, so my explanation may be relevant.

I remember this: a massive trench was dug down Melbourne Grove as they replaced the crumbling Victorian sewer with a giant new concrete one. It took weeks. But I don't remember what they did at the EDG/Melbourne Grove junction.



rch Wrote:

-------------------------------------------------------

.

>

> I have a funny feeling that I remember what was

> behind the concrete reinforcement in this

> location... from memory, Thames Water installed a

> very complicated underground water sewer reservoir

> in this location (in the mid to late 1990s) to

> address some of the sewer floods in the area and

> they bookended the reservoir with concrete

> supports under the road so that vehicles wouldn't

> bash away at the underground structure over time,

> which could cause it to fracture and flood.

>

> But I can't find anyone from highways to speak

> to... ironically, the redirection of the sewers

> towards this underground overflow facility has

> indirectly been causing other flooding problems up

> at the Lordship end of Melbourne for some time,

> but no one appears to have a copy of the EDG

> drawings.

>

> BTW, the Conways guy I spoke to was lovely and

> very helpful... sometimes it's useful to

> communicate.

Ah yes, Reg... I think replacing the crumbling sewers feeding into EDG was part of the bigger picture as it would be more cost effective to dig everything up at the same time. Or, it's possible that what I think of as an overflow facility was actually enlarged sewers being implemented.


But it would make sense that concrete barriers were inserted in order to protect everything from road traffic vibrations.


And I also remember it taking weeks/months. Do you remember what year this was? I seem to think '97 or '98, but I could well be wrong.

The gas works.

Apparently...They?ve dug the holes. They?ve fix everything. They?ll finish filling the holes tomorrow. Then two days - probably this weekend - making good the road ready for reopening for Monday.


This morning it struck me that perhaps East Dulwich Grove has the ambience of pre mass motor cars. Quiet and tranquil.

The Melbourne Grove/EDG junction is now open!


However, there are now more roadworks on EDG by the Dutch Estate up by Alleyn's... not completely closed but the road is reduced to a single lane with traffic lights.


I think the works up by the Dutch Estate are the gas works, James... the closure down by Melbourne was definitely the removal of the concrete slab hump.


Getting a council officer to communicate is impossible, so I'm having to chat to the Conways chaps.

Thanks, James... it's weird, though, as Conways were clear two days in a row that they were removing the concrete underlay "hump" because of vibration complaints.


Maybe Conways had to remove the concrete so that the gas people could reach the gas pipes underneath?


Conversely, there was simultaneous work being done to install services into the new house that's being built at the EDG end of Melbourne... there were gas vans and I spoke to the Thames Water guys, who were clear that they weren't involved in the EDG end of the works.


Maybe the council was actually being efficient (!) and managed to coordinate two or three projects within the context of one road closure??

For some illumination, and possibly some additional puzzlement, do a search at http://public.londonworks.gov.uk/roadworks/home for East Dulwich Grove for 20-23 February. This link _may_ get you there directly. I'm not sure if it's a transient one or not: http://public.londonworks.gov.uk/roadworks/?x=bqGjG*Lzc49wvpLAh0tsUw. The text version sometimes truncates some of the description, but it can be seen in full by clicking each icon in the map version.

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Latest Discussions

    • I think the Brixton Pound lives on, so there must be some kind of appetite for it, but I'm afraid I doubt it would be very useful for me.
    • My primary issue is the noise level and the fact that it begins at dusk and continues well into the early hours, the odd random bang being possibly the worst aspect as you never know when the next volley will occur. This is no longer about celebrating a turning point as the clock strikes 12am, but more a lengthy indulgence in ear shattering bangs, where there also seems to be competition as to who can create the loudest most startling barrage of sustained noise. A new thing is daytime fireworks, where buyers are urged to forget the visual aspect and focus on getting the biggest bang for their buck. I am lucky as I am not super sensitive to noise but I really feel for those who are. As for pets, I am afraid there are now many that require serious medication to get them through- and those meds are not cheap. The fault here is not with the animals or people sensitive to extreme bangs, but with those who insist on their right to impose it on all around them, not just for half an hour a few times a year, but for hours on customary dates and now  spreading to random events throughout the year.I  New Year fireworks is a very recent construct, and now Halloween Fireworks are becoming a thing. Why should we encourage and condone a proliferating societal noise addiction? It really is isn't healthy. Let those who wish to damage their eardrums enjoy their pastime through headphones; they can turn the volume up as high as they like.  If last night was the end of it then that is great but I think there'll be more through the weekend and more discarded jumbo firework boxes dumped in the park. I hope we follow other countries in adopting low noise fireworks and drone shows instead.    
    • NYE is always like this. If you’re concerned about your pets, please consider seeing a vet as they can help. We give our dog valerian and play calming music, which helps especially after long walks and a big dinner. If it’s for yourself, it’s one night, so also suggest seeing your doctor for advice.  It is loud, although more predictable ( kept to evening:to midnight) than Guy Fawkes celebrations which go on for days and are arguably selfish and inconsiderate. Either way, it’s a very difficult time for many.     
    • Thanks Rowan! Well done you have done amazing on your fitness journey. Happy New Year EDF and all my wonderful clients whom I've had the pleasure to train this year. I'm looking forward to 2026 🙌🎊
Home
Events
Sign In

Sign In



Or sign in with one of these services

Search
×
    Search In
×
×
  • Create New...